My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3634
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2024 11:39:50 AM
Creation date
3/28/2024 12:33:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3634
Date (mm/dd/yyyy)
03/21/2024
Description
Ratifying an Agreement w/ Southeastern Surfaces & Equipment to replace the Hardwood Flr at Pelican Community Park Gymnasium.
Supplemental fields
Expiration Date
7/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=7 SOUTHEASTERN <br />SURFACES & EQUIPMENT <br />Florida State Certified M/VIIBE <br />Florida State Certified General Contractor— CGC 092423 <br />QUOTATION <br />TO: CITY OF SUNNY ISLES BEACH DATE: 3/4/2024 <br />Attn: PHONE: <br />From: Emmanuel Blanco FAX: <br />Email: eblanco(a)sseteam.com QUOTE #: 030424-01 <br />PROJECT: PELICAN PARK GYM <br />We are pleased to quote you as follows: <br />GYMNASIUM ATHLETIC EQUIPMENT by PSS: <br />• (1) #4050 CENTER -DRIVE Divider Curtain — 501 x 22'4"H <br />o INSTALL TO DROP BELOW A/C DUCT WITH ATTACHMENT TO EXISTING BEAM <br />o CENTER -DRIVE WINCH MOTOR <br />o BOTTOM HALF SOLID VINYL / TOP HALF MESH <br />o INCLUDES LIFT <br />o ANY ELECTRICAL WORK AS NECESSARY IS EXCLUDED AND TO BE BY OTHERS <br />TOTAL SUPPLIED AND INSTALLED.................................................................................$17,760.00 <br />ADD FOR DEMO AND DISPOSAL BY SSE...........................................................................$3,200.00 <br />Notes: <br />• We accept Visa,_ Master_ Card and American Express._ Payments made using a credit card will require an additional fee of 3.5%. <br />•___ Sales/Use taxes are NOT_INCLUDED in above bid amounts <br />• 50% Deposit required at time of Order. Balance due on completion, with prior approved credit. <br />• Payment and Performance Bonds are NOT INCLUDED in the above price. Add 1% for our standard bond form. If alternate bond <br />forms are required there may be an additional cost and the forms will be subject to approval by our bonding company. <br />• Removal and disposal of existing equipment or materials is NOT INCLUDED. <br />_Materials stored at owner or GC s request will incur storage fees and handling charges, <br />All electrical service requirements including:condult wiring and/orfinal_hook which may be required shall be provided_b� <br />• Hoisting for non -ground floor access, unless specifically indicated above is not included. <br />• 100% Restocking fee on all returned material. <br />• Permits, if required, are not included and shall be provided by others at others expense. <br />• Athletic Equipment — We exclude all overhead support beams. Cradles, other accessories (i.e. height adjusters, safe straps, <br />etc.), shot clocks, or finish painting are not included unless specifically indicated above. <br />• Audience Seating —Aisle lights, "special/custom/designer" (other than standard) fabrics, flooring finishes, other accessories <br />(i.e. Tablet arms, donor plates, etc.), loose seating (i.e. folding chairs), or finished caps for floor anchors are not included unless <br />specifically indicated above. <br />• Exterior Grandstands — All site work including clearing, grading or leveling is excluded. Concrete slabs which <br />may be required beneath the grandstands are not included. <br />P.O. Box 602 • 569 Canal Street • New Smyrna Beach • Florida • 32170 <br />- Phone: (386) 428-8875 • Fax: (386) 428-8767 <br />www.sseteam.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.