Laserfiche WebLink
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />ITEM 41: Furnish all materials, labor, and equipment to install clay roof tile. <br />A) Spanish "S" Tile <br />a) Small Roof Repair Area: <br />0 S.F. - 500 S.F. <br />Approximately: (3) Locations = 1,500 SF @ $ /S. F. = $ <br />TOTAL <br />b) Medium to Large Roof Repair Area <br />501 S.F. and Up <br />Approximately. 2) Locations = 2,000 S.F @ $ /S. F. = $ <br />TOTAL <br />B) Barrel Tile <br />a) Small Roof Repair Area: <br />0 S.F. - 500 S.F. <br />Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ <br />TOTAL <br />b) Medium to Large Roof Repair Area <br />501 S.F. and Up <br />Approximately. 2) Locations = 2, 000 S.F @ $ /S. F. = $ <br />ITEM 42: Furnish all materials, labor, and equipment to install 4" diameter leader. <br />A) 24 Gauge Galvanized Steel <br />a) Small Roof Repair Area: <br />0 S.F. - 500 S.F. <br />Approximately: (3) Locations = 100 L.F. @ $ /L. F. = $ <br />TOTAL <br />b) Medium to Large Roof Repair Area <br />501 S.F. and Up <br />Approximately: _C21 Locations = 300 L. F. @ $ /L. F. = $ <br />TOTAL <br />B) Anodized Aluminum <br />a) Small Roof Repair Area: <br />0 S.F. - 500 S.F. <br />Approximately: � Locations = 100 L. F. @ $ /L. F. = $ <br />TOTAL <br />b) Medium to Large Roof Repair Area <br />501 S.F. and Up <br />Approximately. 2) Locations = 300 L.F. @ $ /L. F. = $ <br />TOTAL <br />C) 24 Gauge Stainless Steel <br />a) Small Roof Repair Area: <br />0 S.F. - 500 S.F. <br />Approximately: � Locations = 100 L.F. @ $ /L. F. = $ <br />TOTAL <br />b) Medium to Large Roof Repair Area <br />501 S.F. and Up <br />Approximately: _ U2 Locations = 300 L.F. @ $ /L. F. = $ <br />TOTAL <br />Revised 6/27/18 Page 66 <br />