SCHEDULE "A"
<br />City of Sunrise Bid No. 19 -17 -12 -HR
<br />PROJECT COST SHEET
<br />CONTRACTOR:
<br />Advanced Roofing
<br />Third Renewal
<br />3.1% Increase
<br />Qty
<br />Pay Item No.
<br />Description
<br />Unit
<br />Price
<br />ITEM 1
<br />ITEM 1-A
<br />Prior to Contractor beginning any other work at the site, Contractor shall remove the asbestos
<br />containing material using a licensed asbestos abatement Contractor. Removal shall be in accordance
<br />with the asbestos test laboratory survey report recommendations provided by the City. This
<br />allowance is to reimburse the Contractor for the actual cost incurred from asbestos abatement and
<br />it does not include any incidental costs. The proposed cost for asbestos abatement shall be
<br />approved prior to performing the work. A copy of the receipt is required for payment.
<br />1
<br />ITEM 1-B
<br />ALLOWANCE for Permits. Contractor markup and overhead is disallwoed. Payment shall be based on
<br />actual bona fide receipts
<br />1
<br />$
<br />3,794.41
<br />ITEM 2
<br />Furnish all materials, labor, and equipment for exisitng roof tear -off, Including existing insulation
<br />board down to substrate. This Rem also includes all disposal costs.
<br />ITEM 2-A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />S.F
<br />$
<br />5.93
<br />ITEM 2-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY
<br />S.F
<br />$
<br />4.74
<br />ITEM 2-13
<br />Large Roof Repair/Replacement Areas -Over 10,001 S.F
<br />SY
<br />$
<br />3.56
<br />ITEM 3
<br />Furnish all materials, labor, and equipment to install approved Isotherm or polylsocyanurate
<br />rigid insulation board tapered, based on 1% inches thickness, fulty attached to substrate.
<br />A)
<br />MOPPED IN:
<br />ITEM 3A -A
<br />Small Roof Repair Areas -0 S.F-500 S.F
<br />S.F
<br />$
<br />4.74
<br />ITEM 3A-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY
<br />S.F
<br />$
<br />4.15
<br />ITEM 3A -C
<br />Large Roof Repair/Replacement Areas -Over 10,001 SY
<br />SY
<br />$
<br />2.96
<br />B)
<br />MECHANICALLY ATTACHED
<br />ITEM 36-A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />S.F
<br />$
<br />5.93
<br />ITEM 3B -B
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY
<br />S.F
<br />$
<br />4.15
<br />ITEM 36-13
<br />Large Roof Repair/Replacement Areas -Over 10,001 SY
<br />SY
<br />$
<br />2.96
<br />ITEM 4
<br />Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with
<br />2 -ply base fl shing, anchor sheet with vent sheet without insulation.
<br />ITEM 4-A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />$
<br />10.67
<br />ITEM 4-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F
<br />S.F
<br />$
<br />4.74
<br />ITEM 4-C
<br />Large Roof Repair/Replacement Areas -Over 10,001 SY
<br />S.F
<br />$
<br />2.96
<br />ITEM 5
<br />Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with
<br />2 -ply base flashing, anchor sheet, without vent sheet (uninsulated applications).
<br />A)
<br />MOPPED IN:
<br />ITEM 5A -A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />S.F
<br />$
<br />8.30
<br />ITEM 5A-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F
<br />S.F
<br />$
<br />4.74
<br />ITEM 5A -C
<br />Large Roof Repair/Replacement Areas -Over 10,001 S.F
<br />S.F
<br />$
<br />2.37
<br />B)
<br />MECHANICALLY ATTACHED
<br />ITEM 513-A
<br />Small Roof Repair Areas -0 S.F-500 S.F
<br />S.F
<br />$
<br />9.49
<br />ITEM 513-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F
<br />S.F
<br />$
<br />5.93
<br />ITEM 513-C
<br />Large Roof Repair/Replacement Areas -Over 10,001 SY
<br />S.F
<br />$
<br />3.56
<br />C)
<br />TORCHED DOWN ATTACHED:
<br />ITEM 5C -A
<br />Small Roof Repair Areas -0 S.F-500 S.F
<br />S.F
<br />$
<br />14.23
<br />ITEM 5C-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F
<br />S.F
<br />$
<br />4.74
<br />ITEM 5C -C
<br />Large Roof Repair/Replacement Areas -Over 10,001 S.F
<br />S.F
<br />$
<br />2.96
<br />D)
<br />ALUMINIUM ROOF COATING(FOR,REFLECTIVITY FOR BLACK ROOF SYSTEMS(SRI 68 MIN.):
<br />Such as 'a och" remium rubberized aluminium roof coating)
<br />ITEM 5D -A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />S.F
<br />$
<br />9.49
<br />ITEM 513-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY
<br />S.F
<br />$
<br />4.45
<br />ITEM 5D -C
<br />Large Roof Repair/Replacement Areas -Over 10,001 S.F
<br />S.F
<br />$
<br />2.96
<br />ITEM 6
<br />Furnish all materials, labor, and equipment to install approved cants, 1% inches thickness by 3%
<br />Inches wide.
<br />ITEM 6-A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />L.F
<br />$
<br />5.93
<br />ITEM 6-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY
<br />L.F
<br />$
<br />1.19
<br />ITEM 6-C
<br />Large Roof Repair/Replacement Areas -Over 10,001 SY
<br />L.F
<br />$
<br />0.59
<br />ITEM 7
<br />Furnish all materials, labor, and equipment to install flexible, non-metallic flashings, 18 inches
<br />wide.
<br />ITEM 7-A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />L.F
<br />$
<br />23.72
<br />ITEM 7-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F
<br />L.F
<br />$
<br />23.72
<br />ITEM 7-C
<br />Large Roof Repair/Replacement Areas -Over 10,001 S.F
<br />L.F
<br />$
<br />17.79
<br />ITEM 8
<br />Furnish all materials, labor, and equipment to install built- up roof repair/replacement, including
<br />ea gravel protection.
<br />ITEM 8-A
<br />Small Roof Repair Areas -0 S.F-500 SY
<br />SY
<br />$
<br />11.86
<br />ITEM 8-13
<br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F
<br />SY
<br />$
<br />2.37
<br />
|