Laserfiche WebLink
SCHEDULE "A" <br />City of Sunrise Bid No. 19 -17 -12 -HR <br />PROJECT COST SHEET <br />CONTRACTOR: <br />Advanced Roofing <br />Third Renewal <br />3.1% Increase <br />Qty <br />Pay Item No. <br />Description <br />Unit <br />Price <br />ITEM 1 <br />ITEM 1-A <br />Prior to Contractor beginning any other work at the site, Contractor shall remove the asbestos <br />containing material using a licensed asbestos abatement Contractor. Removal shall be in accordance <br />with the asbestos test laboratory survey report recommendations provided by the City. This <br />allowance is to reimburse the Contractor for the actual cost incurred from asbestos abatement and <br />it does not include any incidental costs. The proposed cost for asbestos abatement shall be <br />approved prior to performing the work. A copy of the receipt is required for payment. <br />1 <br />ITEM 1-B <br />ALLOWANCE for Permits. Contractor markup and overhead is disallwoed. Payment shall be based on <br />actual bona fide receipts <br />1 <br />$ <br />3,794.41 <br />ITEM 2 <br />Furnish all materials, labor, and equipment for exisitng roof tear -off, Including existing insulation <br />board down to substrate. This Rem also includes all disposal costs. <br />ITEM 2-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />5.93 <br />ITEM 2-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY <br />S.F <br />$ <br />4.74 <br />ITEM 2-13 <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />SY <br />$ <br />3.56 <br />ITEM 3 <br />Furnish all materials, labor, and equipment to install approved Isotherm or polylsocyanurate <br />rigid insulation board tapered, based on 1% inches thickness, fulty attached to substrate. <br />A) <br />MOPPED IN: <br />ITEM 3A -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />$ <br />4.74 <br />ITEM 3A-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY <br />S.F <br />$ <br />4.15 <br />ITEM 3A -C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />SY <br />$ <br />2.96 <br />B) <br />MECHANICALLY ATTACHED <br />ITEM 36-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />5.93 <br />ITEM 3B -B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY <br />S.F <br />$ <br />4.15 <br />ITEM 36-13 <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />SY <br />$ <br />2.96 <br />ITEM 4 <br />Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with <br />2 -ply base fl shing, anchor sheet with vent sheet without insulation. <br />ITEM 4-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />$ <br />10.67 <br />ITEM 4-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />$ <br />4.74 <br />ITEM 4-C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />S.F <br />$ <br />2.96 <br />ITEM 5 <br />Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with <br />2 -ply base flashing, anchor sheet, without vent sheet (uninsulated applications). <br />A) <br />MOPPED IN: <br />ITEM 5A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />8.30 <br />ITEM 5A-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />$ <br />4.74 <br />ITEM 5A -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />$ <br />2.37 <br />B) <br />MECHANICALLY ATTACHED <br />ITEM 513-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />$ <br />9.49 <br />ITEM 513-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />$ <br />5.93 <br />ITEM 513-C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />S.F <br />$ <br />3.56 <br />C) <br />TORCHED DOWN ATTACHED: <br />ITEM 5C -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />$ <br />14.23 <br />ITEM 5C-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />$ <br />4.74 <br />ITEM 5C -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />$ <br />2.96 <br />D) <br />ALUMINIUM ROOF COATING(FOR,REFLECTIVITY FOR BLACK ROOF SYSTEMS(SRI 68 MIN.): <br />Such as 'a och" remium rubberized aluminium roof coating) <br />ITEM 5D -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />9.49 <br />ITEM 513-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY <br />S.F <br />$ <br />4.45 <br />ITEM 5D -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />$ <br />2.96 <br />ITEM 6 <br />Furnish all materials, labor, and equipment to install approved cants, 1% inches thickness by 3% <br />Inches wide. <br />ITEM 6-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />$ <br />5.93 <br />ITEM 6-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY <br />L.F <br />$ <br />1.19 <br />ITEM 6-C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />$ <br />0.59 <br />ITEM 7 <br />Furnish all materials, labor, and equipment to install flexible, non-metallic flashings, 18 inches <br />wide. <br />ITEM 7-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />$ <br />23.72 <br />ITEM 7-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />L.F <br />$ <br />23.72 <br />ITEM 7-C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />L.F <br />$ <br />17.79 <br />ITEM 8 <br />Furnish all materials, labor, and equipment to install built- up roof repair/replacement, including <br />ea gravel protection. <br />ITEM 8-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />SY <br />$ <br />11.86 <br />ITEM 8-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />SY <br />$ <br />2.37 <br />