Laserfiche WebLink
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />1.3 TOLERENCES <br />A. Monitor tolerance control of installed products to produce acceptable work. Do <br />not permit tolerances to accumulate. <br />B. Comply with manufacturers' tolerances. Should manufacturers' tolerances <br />conflict with Contract Documents, request clarification from City Representative <br />before proceeding. <br />C. Adjust products to appropriate dimensions; position before securing products <br />in place. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION <br />3.01 EXAMINATION <br />A. Verify that existing site conditions and substrate surfaces are acceptable for <br />subsequent work. Beginning new work means acceptance of existing conditions. <br />B. Verify that existing substrate is capable of structural support or attachment of new <br />work being applied or attached. <br />C. Examine and verify specific conditions described in individual specification sections. <br />D. Verify that utility services are available, of the correct characteristics, and in the <br />correct locations. <br />3.02 PREPARATION <br />A. Clean substrate surfaces prior to applying next material or substance. <br />B. Seal cracks or openings of substrate prior to applying next material or substance. <br />C. Apply manufacturer required or recommended substrate primer, sealer, or <br />conditioner prior to applying any new material or substance in contact or bond. <br />3.03 CORRECTION DEFECTS <br />A. If during quality control activities, it is determined that a test failure or defect exists <br />and that the construction has not been completed in accordance with the plans and <br />specifications, the CONTRACTOR shall repair or replace such items (repair or <br />replacement decision shall Be by the City of Sunrise Representative) at no <br />additional cost to City of Sunrise. In addition, the cost to retest said item by the <br />established utility control inspector after repair or replacement shall be borne by the <br />CONTRACTOR through credit to City of Sunrise at the rates established within <br />Section 01140. <br />END OF SECTION 01400 <br />Revised 6/27/18 Page 7 <br />