My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3636
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 10:22:10 AM
Creation date
3/28/2024 12:41:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3636
Date (mm/dd/yyyy)
03/21/2024
Description
Agreement w/ Advanced Roofing, Inc. for Citywide Emergency Roof Inspection, Maintenance, & Repair Sevices as-needed basis.
Supplemental fields
Expiration Date
3/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />ITEM 6: Furnish all materials, labor, and equipment to install approved <br />cants, 1% inches thickness by 3%z inches wide. <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: 21 Locations = 25 L-F(d) $ /L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F.- 10,000 S.F.L <br />Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. L <br />Approximately: (4) Locations =_200 LY @ $ /L. F. _ $ <br />TOTAL <br />ITEM 7: Furnish all materials, labor, and equipment to install flexible, <br />non-metallic flashings, 18 inches wide. <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: � Locations = 25 L.F@ $ /L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. - 10,000 S.F. <br />Approximately: � Locations = 90 L.F@ $ /L. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 LY @ $ /L. F. _ $ <br />TOTAL <br />ITEM 8: Furnish all materials, labor, and equipment to install built- <br />up roof repair/replacement, including pea gravel protection. <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately:(1) Location = 450 S.F@ $ /S. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. -15,000 S.F. <br />Approximately: Locations = 12,000 S.F @ $ /S. F. _ $ <br />TOTAL <br />ITEM 9: Furnish all materials, labor, and equipment to install built-up <br />roof pea gravel. <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately:_Llj Location = 450 S.F@ $ /S. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. -15,000 S.F. <br />Approximately: (2) Locations = 12,000 S.F @ $ /S. F. _ $ <br />TOTAL <br />Revised 6/27/18 Page 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.