Laserfiche WebLink
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />ITEM 23: Furnish all materials, labor, and equipment to install 8 inches <br />high x 16 inches wide metal scupper, (4) sided with integral drip <br />strip and surface reglet flashing. <br />A) 24 Gauge Galvanized Steel: <br />Approximately: (4) @ $ /EACH = $ <br />1 V1All <br />B) 24 Gauge Stainless Steel : <br />Approximately: (4) @ $ /EACH = $ <br />1 VIAL <br />ITEM 24: Furnish all materials, labor, and equipment to install 6 -inch <br />diameter leader. <br />A) 24 Gauge Galvanized Steel <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: -L21 Locations = 25 L.F@ $ /L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. -10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: - U4 Locations = 200 L.F @ $ /L. F. _ $ <br />TOTAL <br />B) 24 Gauge Stainless Steel <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: _L21 Locations = 25 L.F@ $ /L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. - 10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ <br />1 VIAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately. 4) Locations = 200 LY @ $ /L. F. _ $ <br />TOTAL <br />C) Anodized Aluminum <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately:_ U2 Locations = 25 L.F@ $ /L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F.- 10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 L.F @ $ /L. F. _ $ <br />1V1HL <br />Revised 6/27/18 Page 56 <br />