My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3637
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2024 11:27:23 AM
Creation date
4/3/2024 5:27:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3637
Date (mm/dd/yyyy)
03/21/2024
Description
4th Amnd w/ Craig A. Smith for Civil Engineering Svcs, for Central Island Area Pump Stations & Drainage Improvements Project
Supplemental fields
Expiration Date
5/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAIG A. SMITH & ASSOCIATES <br />OCASA-0386 <br />PROPOSED SCOPE OF SERVICES <br />CRAIG A. SMITH & ASSOCIATES <br />-- PAGE 1— <br />PROPOSED SCOPE OF SERVICES AND PROPOSED FEE <br />FOR <br />CENTER ISLAND AREA DRAINAGE IMPROVEMENTS <br />PROJECT NAME: CENTRAL ISLAND AREA DRAINAGE IMPROVEMENTS FOR ALTERNATE DESIGN <br />PROPOSAL NO: OCASA-0386 <br />PROJECT DESCRIPTION: Providing professional engineering stormwater analysis for the purposes of <br />implementing 5 smaller simplex stormwater pumping stations with connection to <br />existing City drainage wells to provide flood relief for the Central Island Area of the City <br />in lieu of the current design. <br />OWNER: Sunny Isles Beach <br />Attention: Stan Morris, City Manager <br />smorris(o-)-sibfl.net <br />Address: Sunny Isles Beach Government Center <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />www.sibfl.net <br />Phone: <br />305.792.1776 <br />GENERAL <br />Craig A. Smith & Associates (CAS) proposes to accomplish the services as follows: <br />TASK NO. 1 STORMWATER MODELING ANALYSIS <br />For a potential cost savings approach and in coordination with the City Engineer, Mr. Richard Labinsky, PE, CAS will <br />provide additional stormwater analysis of the Center Island Area project for the purposes of implementing 5 smaller <br />simplex stormwater pumping stations with connection to existing City drainage wells to provide flood relief for the <br />Central Island Area of the City in lieu of the current design. Modeling results will be compared to the current design <br />and shared with the City Engineer for further instructions. <br />The City will coordinate with CAS on the desired locations of the smaller stations. The City will share the most recent <br />performance records (drainage well capacities) of all City drainage wells for inclusion in the models. CAS will submit <br />a technical summary to the City Engineer containing the modeling results of this alternate approach with a comparison <br />
The URL can be used to link to this page
Your browser does not support the video tag.