Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />TERMS <br />1. RECITALS. The Recitals set forth above are hereby incorporated into this Agreement <br />and made a part hereof for reference. <br />2. THE CONTRACT DOCUMENTS. The Contract Documents consist of this Agreement, <br />as well as the terms and conditions of RFQ No. 2018 -183 -KB, entitled "Citywide Demolitions <br />Services on an As -Needed Basis," and the resulting contract, which are specifically incorporated <br />herein and made a part hereof as Attachment "A," as well as the Contractor's proposals, appended <br />hereto as Attachment B" and Attachment "C," respectively (hereinafter referred to collectively <br />as "Contract Documents"). In the event of any conflict between or among the contract documents <br />or any ambiguity or missing specifications or instruction, the following priority is established: <br />A. First, this Agreement Between the City of Sunny Isles Beach and Paragon Construction <br />Unlimited, Inc. — Contract No. 2024-4615. <br />B. Second, the terms and conditions of RFQ No. 2018 -183 -KB, entitled "Citywide <br />Demolitions Services on an As -Needed Basis." <br />C. Third, Contractor's Proposals. <br />3. SERVICES. Contractor shall provide equipment and Services to the City pursuant to the <br />terms and conditions set forth in the Contract Documents, to specifically include, but not limited <br />to, performing demolition work at two (2) city -owned properties, located at 18126 Atlantic <br />Blvd. ("Richelieu Building") and 18050 Collins Avenue ("Annex Building"), as more <br />particularly described in Attachment B" for the Richelieu Building and Attachment "C" for the <br />Annex Building. The Contractor shall furnish all labor, equipment, and materials necessary to <br />complete the Services in accordance with the specifications in the Contract Documents. The <br />Contractor is responsible for obtaining all required permits. <br />4. TERM. Subject to the provisions relating to the termination of this Agreement as set <br />forth hereunder, the term of this Agreement shall commence upon full execution of the Agreement. <br />The Contractor shall neither commence any work, nor enter a City work premise, until a written <br />Notice to Proceed (NTP) directing the Contractor to proceed with the work has been received by <br />the Contractor from the City Manager or Project Manager. With regards to the Richelieu <br />Building, Contractor shall reach Final Completion of the Services within six (6) months from <br />the initiation specified in the NTP (once permits have been received). With regards to the <br />Annex Building, Contractor shall reach Final Completion of the Services within three (3) <br />months from the initiation specified in the NTP (once permits have been received). Time is <br />of the essence. Final Completion shall be defined at that point after which the City Engineer or <br />their representative, have made and approved the Final Inspection and the Punch List has been <br />completed, and all deliverables have been provided to the City. <br />The terms of Sections 18 and 19 entitled "Indemnification and Waiver of Liability," and <br />"Compliance with Law," respectively, shall survive termination of this Agreement. Any and all <br />terms with respect to warranties, including Sections 8 and 9 herein entitled "Warranty of Services" <br />and "Defective Work," and those specifically provided for in the Contract Documents shall also <br />survive termination of this Agreement. <br />PARAGON CONSTRUCTION UNLIMITED, INC. <br />326 <br />