My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3646
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2024 2:40:56 PM
Creation date
4/25/2024 5:03:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3646
Date (mm/dd/yyyy)
04/18/2024
Description
Agreement w/ Paragon Construction Unlimited, Inc. for the interior demolition of property 18050 Collins Ave., and demolition of 18126 Atlantic Ave.
Supplemental fields
Expiration Date
10/31/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. INTENTIONALLY OMITTED <br />8. INTENTIONALLY OMITTED <br />9. Labor and Materials: <br />9.1. Unless otherwise provided herein, Contractor shall provide and pay for all <br />materials, labor, water, tools, equipment, light, power, transportation and other <br />facilities and services necessary for the proper execution and completion of the <br />Work, whether temporary or permanent and whether or not incorporated or to be <br />incorporated in the Work. <br />9.2. Contractor shall at all times enforce strict discipline and good order among its <br />employees and subcontractors at the Project site and shall not employ on the <br />Project any unfit person or anyone not skilled in the work to which they are <br />assigned. <br />10. Royalties and Patents: <br />All fees, royalties, and claims for any invention, or pretended inventions, or patent of any <br />article, material, arrangement, appliance, or method that may be used upon or in any <br />manner be connected with the construction of the Work or appurtenances, are hereby <br />included in the prices stipulated in this Contract for said work. <br />11. Weather: <br />Extensions to the Contract Time for delays caused by the effects of inclement weather <br />shall be submitted as a request for a change in the Contract Time pursuant to Article 41. <br />These time extensions are justified only when rains or other inclement weather conditions <br />or related adverse soil conditions prevent Contractor from productively performing <br />controlling items of work identified on the accepted schedule or updates resulting in: <br />(1) Contractor being unable to work at least fifty percent (50%) of the normal workday <br />on controlling items of work identified on the accepted schedule or updates due to <br />adverse weather conditions; or <br />(2) Contractor must make major repairs to the Work damaged by weather. Providing <br />the damage was not attributable to a failure to perform or neglect by Contractor, <br />and providing that Contractor was unable to work at least fifty percent (50%) of the <br />normal workday on controlling items of work identified on the accepted schedule <br />or updates. <br />12. Permits, Licenses and Impact Fees: <br />12.1. Except as otherwise provided within the Supplemental Conditions, all permits and <br />licenses required by federal, state or local laws, rules and regulations necessary <br />for the prosecution of the Work undertaken by Contractor pursuant to this Contract <br />shall be secured and paid for by Contractor. It is Contractor's responsibility to have <br />and maintain appropriate Certificate(s) of Competency, valid for the Work to be <br />performed and valid for the jurisdiction in which the Work is to be performed for all <br />persons working on the Project for whom a Certificate of Competency is required. <br />25 <br />362 <br />
The URL can be used to link to this page
Your browser does not support the video tag.