My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3646
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2024 2:40:56 PM
Creation date
4/25/2024 5:03:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3646
Date (mm/dd/yyyy)
04/18/2024
Description
Agreement w/ Paragon Construction Unlimited, Inc. for the interior demolition of property 18050 Collins Ave., and demolition of 18126 Atlantic Ave.
Supplemental fields
Expiration Date
10/31/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. Superintendence and Supervision: <br />15.1. The orders of City are to be given through Consultant, which instructions are to be <br />strictly and promptly followed in every case. Contractor shall keep on the Project <br />during its progress, a full-time competent English speaking superintendent and any <br />necessary assistants, all satisfactory to Consultant. The superintendent shall not <br />be changed except with the written consent of Consultant, unless the <br />superintendent proves to be unsatisfactory to Contractor and ceases to be in its <br />employ. The superintendent shall represent Contractor and all directions given to <br />the superintendent shall be as binding as if given to Contractor and will be <br />confirmed in writing by Consultant upon the written request of Contractor. <br />Contractor shall give efficient supervision to the Work, using its best skill and <br />attention. <br />15.2. Daily, Contractor's superintendent shall record, at a minimum, the following <br />information in a bound log: the day; date; weather conditions and how any weather <br />condition affected progress of the Work; time of commencement of work for the <br />day; the work being performed; materials, labor, personnel, equipment and <br />subcontractors at the Project site; visitors to the Project site, including <br />representatives of Consultant; regulatory representatives; any special or unusual <br />conditions or occurrences encountered; and the time of termination of work for the <br />day. All information shall be recorded in the daily log in ink. The daily log shall be <br />kept on the Project site and shall be available at all times for inspection and copying <br />by City and Consultant. <br />15.3. The Contract Administrator, Contractor and Consultant shall meet at least weekly <br />or as determined by the Contract Administrator, during the course of the Work to <br />review and agree upon the work performed to date and to establish the controlling <br />items of work for the next two weeks. * The Consultant shall publish, keep, and <br />distribute minutes and any comments thereto of each such meeting. <br />15.4. If Contractor, in the course of prosecuting the Work, finds any discrepancy <br />between the Contract Documents and the physical conditions of the locality, or any <br />errors, omissions, or discrepancies in the Project Manual, it shall be Contractor's <br />duty to immediately inform Consultant, in writing, and Consultant will promptly <br />review the same. Any work done after such discovery, until authorized, will be <br />done at Contractor's sole risk. <br />15.5. Contractor shall supervise and direct the Work competently and efficiently, <br />devoting such attention thereto and applying such skills and expertise as may be <br />necessary to perform the Work in accordance with the Contract Documents. <br />Contractor shall be solely responsible for the means, methods, techniques, <br />sequences and procedures of construction. <br />16. INTENTIONALLY OMITTED <br />27 <br />364 <br />
The URL can be used to link to this page
Your browser does not support the video tag.