Laserfiche WebLink
The expenses of performing the work after regular working hours, on <br />Sunday or legal holidays, shall be included in the above to the extent <br />authorized by City. <br />39.2.2. Cost of all materials and equipment furnished and incorporated in the <br />work, including costs of transportation and storage thereof, and <br />manufacturers' field services required in connection therewith. All cash <br />discounts shall accrue to Contractor unless City deposits funds with <br />Contractor with which to make payments, in which case the cash <br />discounts shall accrue to City. All trade discounts, rebates and refunds, <br />and all returns from sale of surplus materials and equipment shall <br />accrue to City and Contractor shall make provisions so that they may <br />be obtained. Rentals of all construction equipment and machinery and <br />the parts thereof whether rented from Contractor or others in <br />accordance with rental agreements approved by City with the advice of <br />Consultant and the costs of transportation, loading, unloading, <br />installation, dismantling and removal thereof, all in accordance with the <br />terms of said agreements. The rental of any such equipment, <br />machinery or parts shall cease when the use thereof is no longer <br />necessary for the work. <br />39.2.3. Payments made by Contractor to Subcontractors for work performed <br />by Subcontractors. If required by City, Contractor shall obtain <br />competitive bids from Subcontractors acceptable to Contractor and <br />shall deliver such bids to City who will then determine, with the advice <br />of Consultant, which bids will be accepted. If the Subcontract provides <br />that the Subcontractor is to be paid on the basis of cost of the work plus <br />a fee, the Subcontractor's cost of the work shall be determined in the <br />same manner as Contractor's cost of the work. All Subcontractors shall <br />be subject to the other provisions of the Contract Documents insofar as <br />applicable. <br />39.2.4. Cost of special consultants, including, but not limited to, engineers, <br />architects, testing laboratories, and surveyors employed for services <br />specifically related to the performance of the work described in the <br />Change Order. <br />39.2.5. Supplemental costs including the following: <br />39.2.5.1. The proportion of necessary transportation, travel and <br />subsistence expenses of Contractor's employees incurred <br />in discharge of duties connected with the work except for <br />local travel to and from the site of the work. <br />39.2.5.2. Cost, including transportation and maintenance, of all <br />materials, supplies, equipment, machinery, appliances, <br />office and temporary facilities at the site and hand tools not <br />owned by the workmen, which are consumed in the <br />performance of the work, and cost less market value of <br />such items used but not consumed which remains the <br />property of Contractor. <br />36 <br />373 <br />