Laserfiche WebLink
Contract Clauses for Solicitation 47QSMD20R0001 Refresh Number 19 Contract Number: GS -07F -0031W <br />procurement requirement for the following: <br />(i) Spacecraft system and launch support equipment. <br />(ii) Military equipment, i.e., a product or system designed or procured for combat or <br />combat -related missions. <br />(b) Information about this requirement and these products is available at http://www.biopreferred.gov. <br />(c) In the performance of this contract, the Contractor shall – <br />(1) Report to the environmental point of contact identified in paragraph (d) of this clause, with a <br />copy to the Contracting Officer, on the product types and dollar value of any USDA -designated <br />biobased products purchased by the Contractor during the previous Government fiscal year, <br />between October 1 and September 30; <br />(2) Submit this report no later than – <br />(i) October 31 of each year during contract performance; and <br />(ii) At the end of contract performance. <br />52.216-19 ORDER LIMITATIONS (OCT 1995) <br />(a) Minimum order. When the Government requires supplies or services covered by this contract in an <br />amount of less than TBD [insert dollar figure or quantity], the Government is not obligated to <br />purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract. <br />(b) Maximum order. The Contractor is not obligated to honor — <br />(1) Any order for a single item in excess of See SIN Specific Information [insert dollar figure or <br />quantity]; <br />(2) Any order for a combination of items in excess of See SIN Specific Information [insert dollar <br />figure or quantity]; or <br />(3) A series of orders from the same ordering office within TBD days that together call for <br />quantities exceeding the limitation in paragraph (b)(1) or (2) of this section. <br />(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of <br />the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one <br />requirement from the Contractor if that requirement exceeds the maximum -order limitations in <br />paragraph (b) of this section. <br />(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order <br />exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to <br />the ordering office within TBD days after issuance, with written notice stating the Contractor's intent <br />not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government <br />may acquire the supplies or services from another source. <br />Note: Regulation 52.216-19 <br />"Due to a system limitation, a Maximum Order value of $250,000 has been identified for <br />the Order -Level Materials SIN. However, as Order -Level Materials are only acquired in <br />direct support of an individual task or delivery order, the contractor's right to decline an <br />Page: 29 of 216 <br />116 <br />