RECEIVED <br /> FEB 0 5 2015 <br /> �.tw r Isc <br /> E S —��Fr City of Sunny sles Beach <br /> Office of the C ty Manager <br /> CONTRACT CITY OF <br /> •: SUNNY ISLES BEACH AMENDMENT <br /> Sw '?• RLOh� <br /> C,rr Oi SYw �1 <br /> AMENDMENT NUMBER: #2 DATE: 2015/02/03 <br /> PROJECT: Arlen House Gates <br /> BID NUMBER: 14-07-03 <br /> RESOLUTION NUMBER: 2014-2292 <br /> ORIGINAL DOLLAR CONTRACT AMOUNT: $38,838.95 <br /> NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $457.50 <br /> DOLLAR AMOUNT OF THIS CHANGE ORDER: $1,511.57 <br /> CREDIT/DIRECT PURCHASES: $0 <br /> NEW DOLLAR CONTRACT AMOUNT: $38,838.95 <br /> ORIGINAL CONTACT COMPLETION DATE 12-22-14 <br /> TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 <br /> AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 <br /> NEW CONTRACT COMPLETION DATE: 02/27/14 <br /> DESCRIPTION OF SCOPE OR WORK CHANGES: <br /> Remove and replace the existing card reader at the Arlen House pedestrian gate. As part of the on- <br /> going Men House project, a new pedestrian gate was installed with the intent of maintaining the <br /> existing infrastructure. However, after reconnecting the existing card reader and extensive trouble <br /> shooting, it was determined that a replacement was required in order to restore full pre-construction <br /> functionality to the system. The original dollar contract amount includes a project <br /> contingency of $5,065.95. RCO#1 will be applied to the existing contingency balance of <br /> $4,608.45. Remaining contingency balance after RCO#2 is$3,096.88. <br /> NOTE: Unless specifically stated dearly elsewhere on this page, this contract amendment does NOT include an <br /> extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the <br /> contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the <br /> matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead,profit <br /> and delay relating to the issues set forth in this document. <br /> CONTRACTOR: Tropic Fence <br /> CITY ATTORNEY: Hans Ottinot <br /> PROJECT MANAGER: Elka Linton-Dorsett �'�/ i A <br /> Bill Evans <br /> n/0 <br /> Bill �r <br /> CITY MANAGER: Christopher J. Russo <br />