Laserfiche WebLink
ATTACHMENT "A" <br />8/812014 <br />CIty of Sunrty Isla <br />South Park <br />Option Description <br />Unit UOM <br />Unit Price <br />Total Cost Comments /Notes <br />Emergency Repair <br />Mobilization <br />1 LS <br />$4,500.00 <br />$4,500.00 <br />Shoring & Prep for new Cap & Pik <br />5 k <br />$3,800.00 <br />$19,000.00 <br />Subtotal <br />Emergency Repair <br />523,500.00 <br />Permanent Repair Based on complete repalref bath walls North and South <br />South Park <br />Barge Mobilization <br />1 LS <br />$6,000.00 <br />$6,000.00 <br />F&I New 26'12- sq Batter Pile Inclusive of Cap <br />70 LF <br />$1,000.00 <br />$0,000.00 <br />Removal of Falled Wall Section <br />130 LF <br />$80.00 <br />$110,900.00 <br />F &I New Wag fact of panel, king, batter and cap <br />130 LF <br />$1,600.00 <br />$208,000,00 <br />Form and pour Cap over existing cap (no piles) <br />200 LF <br />$95.00 <br />$19,000.00 <br />Estimated Rip Rap Mitigation <br />130 LF <br />$105.00 <br />$13,650.00 <br />Place geotextile Behind wall with 570 s1 un Itratlon(max depth <br />3.0'below top of cap) <br />400 LF <br />$20.00 <br />$8,000.00 <br />Subtotal Perm Fix <br />$335,050.00 Prices Include: <br />North Park <br />Description <br />Unit UOM <br />Unit Price <br />Total Cost Comments /Notes <br />Mobilization <br />1 LS <br />$0. DO <br />$0.00 <br />Shoring &Prep for new Car p &Pile <br />51s <br />$3,800.00 <br />$19,000.00 <br />Subtotal <br />Emergency Repair <br />$19,000.00 <br />Barge Mobilization <br />1 IS <br />$2,500.00 <br />$2,500.00 <br />F &I New 26' 12" sq Batter Pile Inclusive of Cap <br />500 LF <br />$1,000.00 <br />$500,000.00 <br />Removal of Falled Wall Section(only use ifrequlred) <br />0LF <br />$ 80.00 <br />$0.00 <br />F &I New Wall lncl ofpanel, king, batterand cap(only ifrequlred) <br />0 L <br />$1,600.00 <br />$0.00 <br />Estimated Rip Rap Mitigation (Based on 1 ton per it) <br />500 LF <br />$105.00 <br />$52,500.00 <br />Place geotextlle Behind wall with 578 stone for filtratton(max depth <br />30 below top of cap) <br />500 LF <br />$20.00 <br />$10,000.00 <br />Subtotal Perm Fix <br />$565,000.00 Prices Include: <br />Same as email sent earlier <br />Estimated total value Including Emergency Perm. Fix <br />5942,55m oo <br />Performance and Payment bond <br />1.1% <br />$10,368.05 <br />Total price <br />5952,918.05 <br />All prices Include materialsand labor and equipment for all Items. <br />• No restoration Included ofsod, landscaping or any damged areas <br />due seawall repairs PAC will make every effort to minimize Impacts to <br />pads. <br />' Fill behind wall Is excluded since final elevation has not been <br />determined, Pac will reuse all excavted material and additional <br />material will bean additional charge. <br />'All prices are quoted based on entire wall repair Including North and <br />South Park <br />'Price Quoted using non FDOT piles although piles meet minimum <br />requlremnts of design. <br />ATTACHMENT "A" <br />