Laserfiche WebLink
§ 7 If the Surety elects to act under Section 5.1, 5.2 or 5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the <br />Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the <br />Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without <br />duplication, for <br />.1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; <br />.2 additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or <br />failure to act of die Surety under Section 5; and <br />.3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed <br />performance or non - performance of the Contractor. <br />§ 8 If the Surety elects to act under Section 5.1, 5.3 or 5.4, the Surety's liability is limited to the amount of this Bond. <br />§ 9 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the <br />Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations, No right of action shall accrue on this <br />Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors and assigns. <br />§ 10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase <br />orders and other obligations. <br />§ 11 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or <br />part of the work is located and shall be instituted within two years after a declaration of Contractor Default or within two years after the Contractor <br />ceased working or within hvo years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the <br />provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of <br />the suit shall be applicable. <br />§ 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their signature <br />appears. <br />§ 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be <br />performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions <br />conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be <br />construed as a statutory bond and not as a common law bond. <br />§ 14 Definitions <br />§ 14.1 Balance of the Contract Price. The total amount payable by the Owner to the Contractor under the Construction Contract after all proper <br />adjustments have been made, including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of <br />insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the <br />Contractor under the Construction Contract. <br />§ 14.2 Construction Contract. The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents <br />and changes made to the agreement and the Contract Documents. <br />§ 14.3 Contractor Default. Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material <br />term of the Construction Contract. <br />§ 14.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction <br />Contract or to perform and complete or comply with the other material terms of the Construction Contract. <br />§ 14.5 Contract Documents. All the documents that comprise the agreement between the Owner and Contractor. <br />§ 15 If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond shall be deemed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />S- 1852/AS 8/10 <br />