My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2295
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 3:06:44 PM
Creation date
9/22/2014 1:18:41 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2295
Date (mm/dd/yyyy)
09/18/2014
Description
Ratify Agmt w/PAC Comm Inc. for Construction Srvs for Intracoastal Seawall Repair
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project means the intracoastal seawall emergency repair project, as described in the Contract <br />Documents. <br />Project Site means the area for the Project necessary to complete all Work in connection thereto. <br />Punch List means a compilation of items of Construction Work required to be performed by, or <br />through the Contractor after the Substantial Completion inspection and prior to Final Completion <br />and payment. <br />Request For Information (RFI) means a request from the Contractor seeking an interpretation <br />or clarification by the City relative to the Agreement and /or the Contract Documents. The RFI, <br />which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) <br />requiring clarification or interpretation and why the response is needed. The RFI must set forth the <br />Contractor's interpretation or understanding of the document(s) in question, along with the <br />reason for such understanding. <br />Schedule of Values means a written schedule setting forth the detailed and itemized cost breakdown, <br />inclusive of labor, material, and taxes of all elements comprising the Work. <br />Specifications and Plans as used herein means that portion of the Contract Documents which <br />are the written requirements for the materials, equipment, systems, standards and workmanship for <br />completion of the Work and performance of related services for this Project. <br />Sub- Contractor(s) means a person or entity other than a materialman or laborer that has a <br />direct contract with the Contractor to perform or supply any portion of the Work in connection <br />with this Project. <br />Substantial Completion means that points at which the Work is at a level of completion in <br />substantial compliance with the Contract Documents such that the City can use, occupy and/or <br />operate the Project in all respects for its intended purpose. Substantial Completion shall not be <br />deemed to have occurred until any and all governmental entities, which regulate or have <br />jurisdiction over the Work, have inspected and approved the Work. <br />Time for Completion means the time to complete all Work within the deadlines for Substantial <br />Completion and Final Completion. <br />Work as used herein refers to all services required by the Contract Documents, including all <br />labor, materials, equipment, supervision and services needed to complete the Project in <br />accordance with the Contract Documents. <br />ARTICLE 1. SCOPE OF WORK <br />Contractor shall provide all labor, materials, equipment, tools, manpower, management, <br />supervision, and all other necessary goods and services to perform the Work in the manner <br />provided by this Agreement and the Contract Documents. <br />t�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.