My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3673
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3673
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2024 1:12:00 PM
Creation date
7/11/2024 3:14:55 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3673
Date (mm/dd/yyyy)
06/20/2024
Description
Approving project Agmt w/ Calvin, Giordano & Assoc.,Inc. provide revisions, permitting, and post design svcs for the Golden Shores Pump Station Rehab
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Attend one (1) preconstruction meeting with CITY, CGA <br />Construction Administration Department, and Contractor. <br />• Attend up to twelve (12) biweekly construction progress <br />meetings. <br />• Review up to ten (10) submittals as required of the Contractor, <br />such as shop drawings. This includes one (1) resubmittal review <br />of each, if needed. <br />• Review and respond to Contractor Requests for Information <br />(RFIs). This includes up to ten (10) RFIs. <br />• Review signed and sealed as-builts provided by the Contractor. <br />This includes up to two (2) reviews. <br />• Prepare and submit permit closeout packages to South Florida <br />Water Management District and RER. <br />5. Structural Engineering (Subconsultant) <br />Structural Engineering shall be subcontracted to Alan Gerwig & <br />Associates, Inc. (AGA) for the required revisions to the <br />Structural plans, permitting, bidding, and post design services as <br />they pertain to the Structural components of the project. <br />Permitting is limited to two (2) rounds of comments for items <br />not directly related to an AGA error or omission. <br />Revisions are understood to include specifications and drawings <br />(to meet current code), design of waterproofing for the electrical <br />room slab and walls, lower roof of the electrical room, removal <br />of the door between the electrical room and pump room, <br />removal of the grating and details in the electrical room, adding a <br />new doorway and exterior steps to the pump room, revising the <br />doorway and steps to the electrical room, removing the sluice <br />gate opening in the pump room, removing the sluice gate <br />operator and associated work areas, and revising the sluice gate <br />opener support beam and pump room roof layout. <br />355 <br />255 <br />
The URL can be used to link to this page
Your browser does not support the video tag.