• Assumed six (6) months of active construction time. <br />B. Electrical Engineering <br />1. Data Collection and Evaluation <br />• Field visit to verify existing conditions due to building exterior <br />changes. <br />• Evaluate existing conditions collected during field visit and <br />report to CITY field findings. <br />• Meeting with CITY to review field findings and scope of work. <br />2. Preparation of 90% Construction Documents <br />• Revise MEP plans per revised building plans. It is assumed the <br />previous infrastructure design will remain as designed. Location <br />adjustments of the designed equipment due to floor plan changes <br />is the scope of work. <br />• Revise MEP plans per CITY comments. CITY's comments at <br />this phase shall be minimum. <br />• Provide 90% construction documents to CITY for review, <br />comments and approval. <br />3. Preparation of 100% Construction Documents <br />• Revise MEP (Mechanical, Electrical and Plumbing) plans an <br />incorporate any final CITY comments. <br />• Review and revised previous project design technical <br />specifications. <br />357 <br />257 <br />