My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3673
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3673
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2024 1:12:00 PM
Creation date
7/11/2024 3:14:55 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3673
Date (mm/dd/yyyy)
06/20/2024
Description
Approving project Agmt w/ Calvin, Giordano & Assoc.,Inc. provide revisions, permitting, and post design svcs for the Golden Shores Pump Station Rehab
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Receive and assist in the interpretations and clarifications of the <br />Contract Documents, and evaluate requested deviations from the <br />approved design or specifications. In connection therewith, review, <br />prepare and process any work change directives or change orders <br />requested by the Contractor, or the City. <br />5. Attend meetings with City, Contractor and appropriate regulatory <br />agencies when requested by the City, and necessary for consultation or <br />conferences in regard to construction of the project. <br />6. Make daily inspections for compliance with plans and specifications <br />(estimated at 3 hours per day / or 15 hours per week for twenty (20) <br />weeks, and six (6) hours per week for two (2) weeks); make interim <br />inspections for substantial completion and perform a final inspection to <br />determine, in general, if the work has been completed in conformance <br />with the intent of the Contract Documents. Attend and witness <br />required testing (i.e. pressure testing of F.M., P.S. start-up, utility <br />trench backfill density testing, etc.). <br />7. Coordinate, review, and approve Contractor's construction schedule <br />(s), Schedule of Values (SOV) and pay requests. <br />8. Review as-builts provided by the Contractor. <br />9. Assist EOR with Contractor supplied close-out documentation, and <br />permit certification processing. <br />COST OF THESE SERVICES (Lump Sum) <br />Professional Engineering Services <br />A Professional Civil Engineering Services <br />B Professional Electrical Engineering Services $13,6 <br />III Professional Surveying Services $1 <br />III Professional Construction Services $50,297.51 <br />IV Meetings not included in I thru III Hourl; <br />TOTAL (Plus Hourly Services) , $145,402.5 <br />360 <br />260 <br />
The URL can be used to link to this page
Your browser does not support the video tag.