Laserfiche WebLink
Mr. Mark Castano, P.E. February 21, 2024 <br />Keith & Associates, Inc. . Page 12 <br />Geotechnical Study – Intra Coastal Sports Complex – 15800 Collins Avenue NV5 Project No.: 17990 <br /> <br />CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL <br />7.5 OTHER RECOMMENDATIONS <br /> <br />1. NV5 should participate in the design development phases of this project in order to modify <br />the recommendations provided above as changes occur during the design development <br />process. <br /> <br />2. Vibrations from construction activities could have an adverse impact on adjacent structures. <br />We recommend that pre- and post-construction surveys of adjacent structures of concern be <br />conducted to document conditions. We recommend also vibration monitoring be performed <br />at adjacent structures during site preparation activities. <br /> <br />3. NV5 should participate in the evaluation of field problems as they arise and recommend <br />solutions. We should also be involved with site work activities so we can address needed <br />changes to the foundation recommendations if site conditions different from those described <br />herein are encountered. NV5 should observe and test the foundation installation to satisfy <br />the requirements of the Florida Building Code and municipal agencies. <br /> <br /> <br />8.0 REPORT LIMITATIONS <br /> <br />This report has been prepared pursuant to our proposal 22-0299Rev1 between Keith & Associates, <br />Inc. (“client”) and NV5 dated April 6, 2022, and in general accordance with the standard of care <br />ordinarily practiced by members of Consultant’s profession performing similar services on similar <br />projects in similar localities; no other warranty is expressed or implied. The report should be read in <br />its entirety. NV5 is not responsible for misinterpretations arising from reading sections of the report <br />only. <br /> <br />This report has been prepared for the exclusive use of the Owner and other members of the <br />design/construction team for the specific site(s) and project(s) discussed in this report. The report <br />should not be used for any other site(s) or project(s) without express written permission from NV5. <br /> <br />The evaluation and recommendations submitted in this report are based in part upon the data <br />collected from the field exploration. These data were collected at specific locations and describe <br />subsurface conditions encountered at those specific locations at the time(s) the field explorations <br />were made. Further, the plan area of the field test locations is relatively small as compared to the <br />total site area. Consequently, subsurface conditions could be different at site locations other than <br />those tested. The nature or extent of variations throughout the subsurface may not become evident <br />until the time of construction. If variations later become evident, it may be necessary for NV5 to <br />revisit the recommendations provided in this report. <br /> <br />In the event changes are made in the nature, design, or location(s) of the proposed project <br />construction, the conclusions and recommendations contained in this report cannot not be relied <br />upon unless the changes are reviewed by NV5, and the conclusions and recommendations herein <br />are either verified or modified as needed in writing by NV5. Therefore, NV5 must be informed of any <br />such changes if those changes are not addressed in this report. <br /> <br />The scope of services performed by NV5 did not include any environmental assessment or <br />investigation for the presence or absence of wetlands, sinkholes, chemically hazardous or toxic <br />materials in the soil, surface water, groundwater or air, on or below or around the site. <br /> <br />NV5 should be retained to provide consultation to the ownership and design team during the design <br />development phase of the project, to review final foundation specifications and review foundation