My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 1:06:34 PM
Creation date
7/31/2024 1:01:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Mark Castano, P.E. February 21, 2024 <br />Keith & Associates, Inc. . Page 12 <br />Geotechnical Study – Intra Coastal Sports Complex – 15800 Collins Avenue NV5 Project No.: 17990 <br /> <br />CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL <br />7.5 OTHER RECOMMENDATIONS <br /> <br />1. NV5 should participate in the design development phases of this project in order to modify <br />the recommendations provided above as changes occur during the design development <br />process. <br /> <br />2. Vibrations from construction activities could have an adverse impact on adjacent structures. <br />We recommend that pre- and post-construction surveys of adjacent structures of concern be <br />conducted to document conditions. We recommend also vibration monitoring be performed <br />at adjacent structures during site preparation activities. <br /> <br />3. NV5 should participate in the evaluation of field problems as they arise and recommend <br />solutions. We should also be involved with site work activities so we can address needed <br />changes to the foundation recommendations if site conditions different from those described <br />herein are encountered. NV5 should observe and test the foundation installation to satisfy <br />the requirements of the Florida Building Code and municipal agencies. <br /> <br /> <br />8.0 REPORT LIMITATIONS <br /> <br />This report has been prepared pursuant to our proposal 22-0299Rev1 between Keith & Associates, <br />Inc. (“client”) and NV5 dated April 6, 2022, and in general accordance with the standard of care <br />ordinarily practiced by members of Consultant’s profession performing similar services on similar <br />projects in similar localities; no other warranty is expressed or implied. The report should be read in <br />its entirety. NV5 is not responsible for misinterpretations arising from reading sections of the report <br />only. <br /> <br />This report has been prepared for the exclusive use of the Owner and other members of the <br />design/construction team for the specific site(s) and project(s) discussed in this report. The report <br />should not be used for any other site(s) or project(s) without express written permission from NV5. <br /> <br />The evaluation and recommendations submitted in this report are based in part upon the data <br />collected from the field exploration. These data were collected at specific locations and describe <br />subsurface conditions encountered at those specific locations at the time(s) the field explorations <br />were made. Further, the plan area of the field test locations is relatively small as compared to the <br />total site area. Consequently, subsurface conditions could be different at site locations other than <br />those tested. The nature or extent of variations throughout the subsurface may not become evident <br />until the time of construction. If variations later become evident, it may be necessary for NV5 to <br />revisit the recommendations provided in this report. <br /> <br />In the event changes are made in the nature, design, or location(s) of the proposed project <br />construction, the conclusions and recommendations contained in this report cannot not be relied <br />upon unless the changes are reviewed by NV5, and the conclusions and recommendations herein <br />are either verified or modified as needed in writing by NV5. Therefore, NV5 must be informed of any <br />such changes if those changes are not addressed in this report. <br /> <br />The scope of services performed by NV5 did not include any environmental assessment or <br />investigation for the presence or absence of wetlands, sinkholes, chemically hazardous or toxic <br />materials in the soil, surface water, groundwater or air, on or below or around the site. <br /> <br />NV5 should be retained to provide consultation to the ownership and design team during the design <br />development phase of the project, to review final foundation specifications and review foundation
The URL can be used to link to this page
Your browser does not support the video tag.