My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping & Lawn Service, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-06-02) Citywide Landscape Maintenance Services
>
Responses
>
Superior Landscaping & Lawn Service, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2024 4:10:41 PM
Creation date
8/5/2024 4:09:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />th <br />175 Terrace <br />36 <br />E12 52 Weeks <br />(from Atlantic Blvd. to Collins Ave.) <br /> 182.00 9,464.00 <br />$ $ <br />North Bay Road <br />37 <br />E13 52 Weeks <br />(from 174 St. to 183 St.) <br /> 282.00 14,664.00 <br />$ $ <br />38 <br />Atlantic Boulevard <br />E14 52 Weeks <br /> 247.00 12,844.00 <br />$ $ <br />(from 175 Terr. to 183 St.) <br />th <br />177 Drive <br />39 <br />E15 52 Weeks <br />(from Church Dr. to Atlantic Blvd.) <br /> 187.00 9,724.00 <br />$ $ <br />40 <br />Church Drive <br />E16 52 Weeks <br /> 187.00 9,724.00 <br />$ $ <br />(from 178 Dr. to 177 Dr.) <br />41 <br />th <br />178 Drive <br />E17 52 Weeks <br /> 187.00 9,724.00 <br />$ $ <br />(from N. Bay Rd. to Collins Ave.) <br />th <br />178Street <br />42 <br />TH <br />E18 52 Weeks <br />(from N. Bay Rd. to 178 St) <br /> 197.00 10,244.00 <br />$ $ <br />th <br />179 Drive <br />43 <br />E19 52 Weeks <br />(from N. Bay Rd. to 178 St.) <br /> 197.00 10,244.00 <br />$ $ <br />th <br />180 Drive <br />44 <br />E20 52 Weeks <br />(from N. Bay Rd. to Atlantic Blvd.) <br /> 197.00 10,244.00 <br />$ $ <br />45 <br />st <br />Drive <br />181 <br />E21 <br />52 Weeks <br /> 197.00 10,244.00 <br />$ $ <br />(from N. Bay Rd. to Atlantic Blvd.) <br />46 <br />nd <br /> Drive <br />182 <br />E22 <br />52 Weeks <br /> 197.00 10,244.00 <br />$ $ <br />(from N. Bay Rd. to Atlantic Blvd.) <br />47 <br />rd <br />183 Street <br />E23 52 Weeks <br /> 197.00 10,244.00 <br />$ $ <br />(from North Bay Road to Collins Avenue.) <br />48 <br />N.Bay Road Pedestrian Emergency Bridge <br />E24 52 Weeks <br /> 272.00 14,144.00 <br />$ $ <br />from 174th St. to 172nd St. <br />Daily Litter Pickup for A1 – A2 <br />49 <br />52 Weeks <br />E25 <br />(7 Days A Week, Twice per Day) <br /> 1,107.00 57,564.00 <br />$ $ <br />Daily Litter Pickup for A3 – A24 <br />E26 <br />50 <br /> 1,542.00 80,184.00 <br />$ $ <br />(7 days A Week – Once per Day) 52 Weeks <br />Subtotal Section “E” Lines No. 25 – 50: <br />$ <br /> 668,044.00 <br />ITB 24-06-02 CITYWIDE LANDSCAPING SERVICES 88 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.