My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGO CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
LEGO CONSTRUCTION CO
>
LEGO CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:27:33 AM
Creation date
9/11/2024 11:24:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP ITB # 24-07-01 - INTRACOASTAL SPORTS COURT COMPLEX <br />CITY OF SUNNY ISLES BEACH 22 <br />Design-Build Paint <br />Facility Miami Beach <br />U. S. Coast Guard (USCG) <br />Past Experience- Project #9 <br />The work includes the demolition of the existing Paint <br />and Sandblast building, site and groundwork, and <br />construction of a new Facility. The new facility is a pre- <br />engineered metal building and this building will have <br />the new paint & sandblast booth equipment along with <br />their dust collectors etc. This is a multi-disciplinary <br />project that included complete architecture, structural, <br />and interior packages for the new facility. Complete <br />installation of electrical power distribution, lighting, <br />and communications system; complete installation <br />of the HVAC system for the facility; Structural interior <br />design (SID) and furniture, fixtures, and equipment <br />comprehensive interior design (CID) and installation <br />included.The facility is designed and constructed for sea <br />salt-laden air and hurricane resiliency. <br />Delivery Type: Design-Build <br />Project Budget: $7,311,557.33 <br />Project Commencement: 01/15/21 <br />Project Completion: 06/30/23 <br />Project Square footage: 8164 SF <br />Contract Role: Prime Contractor <br />Key Relevancy <br />• Occupied facility <br />• Active during Construction <br />• After Hours Demolition <br />• Strategic Phasing <br />• Installation of <br />specialized equipment <br />Owner’s Projects <br />Representative <br />POC Name: Charlotte Armstrong <br />P: (757) 670-82720 / <br />E: charlotte.m.armstrong2@uscg.mil <br />Key Personnel ( Assigned to this Project ) <br />Miguel Guerrero <br />Pre Construction <br />Manager <br />Satya Nethi <br />Lead Estimator <br />Federal <br />NEW <br />construction <br />Mariela Lobo <br />Project Manager <br />Luis Garcia <br />Project Executive
The URL can be used to link to this page
Your browser does not support the video tag.