My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MBR CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
MBR CONSTRUCTION
>
MBR CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:31:21 AM
Creation date
9/11/2024 11:29:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FIRMS EXPERIENCE AND QUALIFICATIONS <br /> <br /> <br /> 8 | P a g e <br /> <br />10. SULLIVAN PARK – (January 2017) New Development <br />Scope of Work: The work will include but not be <br />limited to clearing, demolition, installation of <br />drainage system, curbing, sidewalks, road & parking <br />reconstruction, landscaping, lighting, paving, <br />playground equipment, 5,000 SF water play feature, <br />boat dock, restroom building, and stair tower, <br />relocation of the water mains and other construction <br />services with the exception of the removal and <br />undergrounding of FPL overhead power lines. <br />One of the most exciting parts of this project was the watching the evolution of an ART project <br />component that consisted of a handmade tile mosaic assembled by the community led by an local <br />artist and installed by MBR Construction. <br />Original Contract Amount: $ 3,790,343.00 Final Contract Amount: $ 3,760,634.83 <br />Client: City of Deerfield Beach Contact: Mark DiMascio, Project Manager <br />Telephone: 954-952-0221 Email: MDiMascio@deerfield-beach.com <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.