My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MBR CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
MBR CONSTRUCTION
>
MBR CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:31:21 AM
Creation date
9/11/2024 11:29:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />General Approach: We understand the importance of providing a single point of contact to <br />achieve a clear communication channel with our client and ensure the success of the project. <br />Our Project Manager will be reachable at any time by phone or electronic mail. <br /> <br />Before MBR Construction, Inc. starts a Guaranteed Maximum Price has already been <br />determined. All team members will be coordinated by the lead Project Manager. On a weekly <br />basis, the Project Manager and team members review the project development against the plan <br />presented at the beginning of the project. The technical quality of the work is reviewed at three <br />intervals. The emphasis of these reviews is to ensure the construction documents adhere to the <br />contract documents, stay within the budget price, and to coordinate with the associated <br />disciplines to satisfy the program requirements. The team’s cost estimator reviews the <br />documents with emphasis on clarity of details and drawing comprehensiveness. In addition, <br />they make recommendations on construction techniques utilizing proven cost-effective systems <br />to maintain the GPM established originally. <br /> <br />Pre-Design Phase <br /> <br />Scheduling <br />The most important tool for the success of a Project is the Job schedule. <br />MBR uses Microsoft Projects to generate schedules on all projects. At the start of the project <br />the Owner, architect and MBR will determine the level of scheduling detail that is necessary for <br />the project. Our Project Manager will be responsible for updating the schedule in a timely <br />manner. <br />The main objective of a schedule is to develop a well defined, realistic flow of work activities <br /> <br />Design Phase <br />During this phase MBR will play a key role in assisting the design team to achieve a cost- <br />effective, high-quality design that will meet the Client’s program. This goal is achieved through <br />design reviews at various stages. Also, during this phase MBR will provide estimating, <br />scheduling, and will identify long lead items to prevent delays. <br />MBR will develop a Guaranteed Maximum Price based on a complete set of design documents <br /> <br />Coordination of Team Members/Subcontractors <br />All team members will be coordinated by the lead Project Manager. On a weekly basis, the <br />Project Manager and team members review the project development against the plan <br />presented at the beginning of the project. The technical quality of the work is reviewed at three <br />intervals. The emphasis of these reviews is to ensure the construction documents adhere to the <br />contract documents, stay within the budget price, and to coordinate with the associated <br />disciplines to satisfy the program requirements. The team’s cost estimator reviews the <br />documents with emphasis on clarity of details and drawing comprehensiveness. In addition, <br />they make recommendations on construction techniques utilizing proven cost-effective systems <br /> <br />Project meetings <br />During the design phase, MBR will conduct progress meetings and generate reports of these <br />meetings to ensure that critical design submittals dates are met. <br />APPROACH / METHODOLOGY
The URL can be used to link to this page
Your browser does not support the video tag.