Laserfiche WebLink
11.01 Not Used <br />12.00 FURNISHINGS <br />12.01 Exterior Furniture LS $ 20,580.00 <br />13.00 SPECIAL CONSTRUCTION <br />13.01 Security camera infrastructure only (allowance) - does not include cameras LS $ 15,708.00 <br />14.00 CONVEYING <br />14.01 Not Used <br />15.00 FIRE SUPPRESSION <br />15.01 Not Used <br />15.20 PLUMBING <br />15.21 Water closets LS $ 1,224.00 <br />15.22 Lavatories LS $ 2,040.00 <br />15.23 Exterior electric drinking fountain LS $ 3,570.00 <br />15.24 Hose bibb LS $ 510.00 <br />15.25 Roof drain & leaders LS $ 9,792.00 <br />15.26 Floor drains LS $ 918.00 <br />15.27 Sanitary, water, storm system LS $ 23,561.00 <br />15.50 HEATING, VENTILATION & AIR CONDITIONING <br />15.51 Exhaust fans LS $ 5,900.00 <br />15.52 HVAC ductwork/supply diffusers/return grills LS $ 5,450.00 <br />15.53 AHU, controls, VAVs, termination LS $ 16,540.00 <br />16.00 ELECTRICAL <br />16.01 LED interior lay-in light fixtures (2' X 2')LS $ 8,900.00 <br />16.02 LED interior lay-in light fixtures (2' X 2') - Emergency LS $ 6,490.00 <br />16.03 LED pendant/surface mount light fixtures LS $ 11,310.00 <br />16.04 LED pendant/surface mount light fixtures - Emergency LS $ 10,800.00 <br />16.05 LED exterior linear light fixtures LS $ 10,800.00 <br />16.06 LED exterior wall mounted light fixtures LS $ 9,920.00 <br />16.07 Batt. operated wall mounted emergency lighting LS $ 6,536.00 <br />16.08 Switches LS $ 4,080.00 <br />16.09 Exit signs LS $ 4,492.00 <br />16.10 Receptacles/GFI/WP/Data LS $ 4,080.00 <br />111.01 Panels/switchgear LS $ 18,037.00 <br />111.02 F/A system LS $ 13,581.00 <br />111.03 Lightning protection LS $ 18,054.00 <br />111.04 Electrical underground LS $ 15,300.00 <br />EQUIPMENT SUBTOTAL <br />1 $ 20,580.00 <br />FURNISHINGS SUBTOTAL $ 20,580.00 <br />1 $ 15,708.00 <br />SPECIAL CONSTRUCTION SUBTOTAL $ 15,708.00 <br />CONVEYING SUBTOTAL <br />FIRE SUPPRESSION SUBTOTAL <br />1 $ 1,224.00 <br />1 $ 2,040.00 <br />1 $ 3,570.00 <br />1 $ 510.00 <br />1 $ 9,792.00 <br />1 $ 918.00 <br />1 $ 23,561.00 <br />PLUMBING SUBTOTAL $ 41,615.00 <br />1 $ 5,900.00 <br />1 $ 5,450.00 <br />1 $ 16,540.00 <br />HEATING, VENTILATION & AIR CONDITIONING SUBTOTAL $ 27,890.00 <br />1 $ 8,900.00 <br />1 $ 6,490.00 <br />1 $ 11,310.00 <br />1 $ 10,800.00 <br />1 $ 10,800.00 <br />1 $ 9,920.00 <br />1 $ 6,536.00 <br />1 $ 4,080.00 <br />1 $ 4,492.00 <br />1 $ 4,080.00 <br />1 $ 18,037.00 <br />1 $ 13,581.00 <br />1 $ 18,054.00 <br />1 $ 15,300.00 <br />ELECTRICAL SUBTOTAL: $ 142,380.00 <br />BUILDING COMPLEX GRAND SUB-TOTAL: $ 906,228.00 <br />PROJECT GRAND (BUILDING AND SITE) TOTAL: $ 3,197,762.76 <br />ALTERNATE OPTIONS NOT INCLUDED ABOVE <br />ALTERNATES SUBTOTAL $ <br />GRAND TOTAL + ALTERNATES $ 3,197,762.76