Laserfiche WebLink
ITB 24-07-02 Intracoastal Sports Court Complex - City of Sunny Isles Beach, FL <br />BID PRICE SHEET - ADDENDUM # 3 PRICE SHEET - BIDDER'S MUST USE THIS PRICE SHEET <br />GENERAL CONDITIONS <br />ITEM # <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />TOTAL <br />1 <br />IMobilization <br />1 <br />LS <br />:30,000.00 <br />30,000.00 <br />2 <br />1 Maintenance of Traffic <br />1 <br />LS <br />15,500.00 <br />115,500.00 <br />3 <br />lConstruction Surveying/As-builts <br />1 <br />LS <br />18,000.00 <br />18,000.00 <br />4 <br />lConstruction Testing <br />1 <br />LS <br />15,500.00 <br />15,500.00 <br />5 <br />113onds & Insurance <br />1 <br />LS <br />!93,000.00 <br />93,000-00 <br />6 <br />Permit Fee <br />1 <br />LS <br />1 <br />10.000.00 <br />7 <br />Overhead and Profit (Includes general requirements & O&P) <br />1 1 <br />LS <br />11393,000.00 <br />693,000.00 <br />General Conditions Subtotal <br />S 875,000.00 <br />PAVING, GRADING AND DRAINAGE <br />ITEM # <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />TOTAL <br />8 <br />Site clearing (sod, landscape, tree removal) <br />1 <br />LS <br />42,800.00 <br />42,800.00 <br />9 <br />F&I Control Structure <br />1 <br />EA <br />5,600.00 <br />5,600.00 <br />10 <br />Miscellaneous site work and underground utilities <br />1 <br />LS <br />5,000.00 <br />5,000.00 <br />11 <br />Building ad grading <br />1 <br />LS <br />18,600.00 <br />18,600.00 <br />12 <br />IF&I Drainage Well <br />1 <br />EA <br />82,500.00 <br />82,500.00 <br />13 <br />F&I Drainage Structures (Manhole) <br />2 <br />EA <br />7,500.00 <br />15,000.00 <br />14 <br />F&I Drainage Structure Yard Drain <br />3 <br />EA <br />6.500.00 <br />'19,500.00 <br />15 <br />IF&I Drainaqe Well 15-inch HDPE <br />447 <br />LF <br />73.00 <br />'32,631.00 <br />16 <br />IF&I Drainage Well 12-inch HDPE <br />56 <br />LF <br />50.00 <br />2,800.00 <br />17 <br />IF&I Exfiltration Trench <br />219 <br />Cy <br />298.00 <br />55,262.00 <br />18 <br />IF&I Sidewalk <br />341 <br />SY <br />113.00 <br />38,533.00 <br />19 <br />IF&I T e'D' Curb <br />345 <br />LF <br />23.00 <br />7,935.00 <br />20 <br />IF&I Asphalt (Parking Lot & Tennis Courts <br />1740 <br />SY <br />68.00 <br />118.320.00 <br />21 <br />Storm Pollution Prevention Measures <br />1 <br />LS <br />13,800.00 <br />3,800.00 <br />22 <br />Regular Excavation (Cut) <br />r 464 1 <br />CY <br />138.00 <br />17,632.00 <br />Paving, Grading and Drainage Subtotall $478,913.00 <br />'WATER AND SEWER <br />ITEM # <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />TOTAL <br />23 <br />IF&1 2" Water Service HDPE <br />122 <br />LF <br />215.00 <br />26,230.00 <br />24 <br />IF&I 2" Irrigation Line and RPZ <br />1 <br />LS <br />6,500.00 <br />8,500.00 <br />25 <br />2" BFP <br />1 <br />EA <br />2,500.00 <br />2,500.00 <br />26 <br />:F&I 6" Sewer line PVC <br />106 <br />LF <br />70.00 <br />7,420.00 <br />27 <br />Cleanout <br />4 <br />EA <br />1,200.00 <br />Water and Sewer Subtotal <br />$47,450.00 <br />PAVEMENT MARKING <br />ITEM # <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />TOTAL <br />28 <br />F&I Pavement Markings & Signage <br />1 <br />LS <br />4,500.00 <br />4,500.00 <br />Pavement Marking Subtotal <br />$ 4,500.00 <br />HAftDSCAPE <br />ITEM # <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />TOTAL <br />29 <br />(Marble Chi /Shell Aggregate. Standard Grey Concrete. 4" thickness <br />4,821 <br />SF <br />30.00 <br />144,630.00 <br />30 <br />Style "B" Concrete Paver, 8"x8", Camel Shell Stone <br />983 <br />SF <br />9.00 <br />8,847.00 <br />31 <br />S le "C" Concrete Paver. 4"x8". Camel Shell Stone <br />240 <br />SF <br />11.00 <br />2,640.00 <br />32 <br />Bench: Landscape Forms -Parc Vue, Backless, 72"L x 22"W x 18"H <br />3 <br />EA <br />3,982.00 <br />11,946.00 <br />33 <br />LitterReceptacle: ine-mo e : - 34 (errace Trash Can), 32gal, x x <br />38"H <br />3 <br />EA <br />3,108.00 <br />9,324.00 <br />34 <br />Bike Rack: Landscape Forms-Ride, 4"W x 28"L x 26"H <br />2 <br />EA <br />823.00 <br />1,646.00 <br />35 <br />10'HT Court Fencing, Black Vinyl Coated Chain Link. Windscreen <br />534 <br />LF <br />•65.00 <br />:34,710.00 <br />36 <br />Court Cabana Shade Structure, 2 post-black powdercoated frame, shade fabric, 96"L x <br />72"W <br />1 <br />EA <br />19,500.00 <br />19,500.00 <br />37 <br />Tubular Barrier Gates for Entry Drive, Hoover Fence Co-"S" Series, Double gate, T47 <br />overall Length <br />1 1 <br />EA <br />10,200.00 <br />110,200.00 <br />