|
2.01
<br />Not used
<br />INTRACOASTAL
<br />ITEM #
<br />COURTSPORTSBUILDING
<br />QTY
<br />UNIT
<br />SIRMTAL
<br />UNIT COST
<br />TOTAL
<br />3.01
<br />Concrete floor slab
<br />1
<br />LS
<br />185,500.00
<br />65,500.00
<br />3.02
<br />Concrete beams
<br />1
<br />LS
<br />72,500.00
<br />72,500.00
<br />3.03
<br />Concrete wall reinforcement / filled cells
<br />1
<br />LS
<br />.58,700.00
<br />58,700.00
<br />3.04
<br />Concrete footings
<br />1
<br />LS
<br />130,700.00
<br />130,700.00
<br />CONCRETE SUBTOTAL S 327,400,00
<br />4.01
<br />Masonry walls - 8" thick
<br />1
<br />L5
<br />9,500.00
<br />9.500.04
<br />MASONRY SUBTOTAL $9,500.00
<br />J5.01
<br />Aluminum wall siding
<br />1
<br />LS
<br />45,850.00
<br />45,850.00
<br />5.02
<br />Vertical aluminum battens
<br />1
<br />LS
<br />122,560.00
<br />122,560.00
<br />5.03
<br />Aluminum suspended ceiling panels
<br />1
<br />LS
<br />:,3,000.00
<br />:53,000.00
<br />METALS SUBTOTAL $221,410.00
<br />6.01
<br />Millwork
<br />1
<br />LS
<br />9,268-00
<br />9,300.00
<br />6.02
<br />Misc. rough carpentry
<br />1
<br />1 LS
<br />12,900.00
<br />2,900.00
<br />WOOD, PLASTICS & COMPOSITES
<br />SUBTOTAL $12,200.00
<br />7.01
<br />Roofing and LWC - including all accessories
<br />1
<br />LS
<br />46.800.00
<br />46,800.00
<br />7.02
<br />Insulation -walls
<br />1
<br />LS
<br />:3,200.00
<br />3,200.00
<br />7.03
<br />Firestopping and smoke sealing
<br />1
<br />LS
<br />:3,800.00
<br />3,800.00
<br />7.04
<br />Weather Resistant Barrier
<br />1
<br />LS
<br />2.100.00
<br />2,100.00
<br />7.05
<br />Joint sealant
<br />1
<br />LS
<br />1,800.00
<br />1,800.00
<br />'Wig: ({ti{r: - - - - - - - -
<br />THERMAL & MOISTURE PROTECTION SUBTOTAL
<br />$.
<br />8.01
<br />Storefront system
<br />1
<br />LS
<br />55,030.00
<br />55,030.00
<br />8.02
<br />New single doors - metal w/ hollow metal frame (36" x 84")
<br />1
<br />LS
<br />15,600.00
<br />5,600.00
<br />8.03
<br />New double doors - metal w/ hollow metal frame (60" x 84")
<br />1
<br />LS
<br />6,100.00
<br />6,100.00
<br />8.04
<br />Pass-thru window1
<br />LS
<br />2,500.00
<br />2,500.00
<br />❑P1;NINGS SUBTOTAL $ 68,230.Q0 - - -
<br />9.01
<br />jInterior plaster/stucco (includes lath)
<br />1
<br />LS
<br />112,03000
<br />12,030.00
<br />9.02
<br />Epoxy painting (restroom flooring)
<br />1
<br />LS
<br />3,850.00
<br />3,850.00
<br />9.03
<br />Architectural finishes / GWB and tile accessories
<br />1
<br />LS
<br />2,800.00
<br />2,800.00
<br />9.04
<br />New exterior stucco (5/8" min.)
<br />1
<br />LS
<br />10,200.00
<br />10,200.00
<br />9.05
<br />Exterior painting (WRB coat)
<br />1
<br />LS
<br />7,120.00
<br />7,120.00
<br />9.06
<br />Interior painting
<br />1
<br />LS
<br />,3,800.00
<br />3,800.00
<br />9.07
<br />5/8" gypsum board wall and ceiling finish
<br />1
<br />LS
<br />16,200.00
<br />16,200.00
<br />9.08
<br />1/2" Densglass sheathing
<br />1
<br />LS
<br />2,800.00
<br />2,800.00
<br />9.09
<br />Wall tile - restrooms
<br />1
<br />LS
<br />;5,300.00
<br />5,300.00
<br />9.10
<br />Suspended acoustical ceiling tile
<br />1
<br />LS
<br />2,500.00
<br />2,500.00
<br />9.11
<br />Framing
<br />1
<br />LS
<br />15,800.00
<br />15,800.00
<br />9.12
<br />Stone wall finish
<br />1
<br />LS
<br />18.250.00
<br />8,250.00
<br />9.13
<br />JVCT Flooring
<br />1
<br />LS
<br />5,800.00
<br />5,800.00
<br />FINISHES SUBTOTAL $9�,d50.1J0
<br />1 t IMMWI-
<br />10.01
<br />Aeess panels
<br />1
<br />LS
<br />620.00
<br />620.00
<br />10.02
<br />Toilet room accessories (allowance)
<br />1
<br />LS
<br />6,080.00
<br />6,080.00
<br />10.03
<br />Room ID signs
<br />1
<br />LS
<br />15,900.00
<br />15,900.00
<br />10.04
<br />Fire extinguishers
<br />1
<br />LS
<br />670.00
<br />670.00
<br />
|