|
ITB 24-07-02 Intracoastal Sports Court Complex - City of Sunny Isles Beach, FL
<br />BID PRICE SHEET - ADDENDUM # 3 PRICE SHEET - BIDDER'S MUST USE THIS PRICE SHEET
<br />GENERAL CONDITIONS
<br />ITEM #
<br />ITEM
<br />QTY
<br />UNIT
<br />UNIT COST
<br />TOTAL
<br />1
<br />IMobilization
<br />1
<br />LS
<br />:30,000.00
<br />30,000.00
<br />2
<br />1 Maintenance of Traffic
<br />1
<br />LS
<br />15,500.00
<br />115,500.00
<br />3
<br />lConstruction Surveying/As-builts
<br />1
<br />LS
<br />18,000.00
<br />18,000.00
<br />4
<br />lConstruction Testing
<br />1
<br />LS
<br />15,500.00
<br />15,500.00
<br />5
<br />113onds & Insurance
<br />1
<br />LS
<br />!93,000.00
<br />93,000-00
<br />6
<br />Permit Fee
<br />1
<br />LS
<br />1
<br />10.000.00
<br />7
<br />Overhead and Profit (Includes general requirements & O&P)
<br />1 1
<br />LS
<br />11393,000.00
<br />693,000.00
<br />General Conditions Subtotal
<br />S 875,000.00
<br />PAVING, GRADING AND DRAINAGE
<br />ITEM #
<br />ITEM
<br />QTY
<br />UNIT
<br />UNIT COST
<br />TOTAL
<br />8
<br />Site clearing (sod, landscape, tree removal)
<br />1
<br />LS
<br />42,800.00
<br />42,800.00
<br />9
<br />F&I Control Structure
<br />1
<br />EA
<br />5,600.00
<br />5,600.00
<br />10
<br />Miscellaneous site work and underground utilities
<br />1
<br />LS
<br />5,000.00
<br />5,000.00
<br />11
<br />Building ad grading
<br />1
<br />LS
<br />18,600.00
<br />18,600.00
<br />12
<br />IF&I Drainage Well
<br />1
<br />EA
<br />82,500.00
<br />82,500.00
<br />13
<br />F&I Drainage Structures (Manhole)
<br />2
<br />EA
<br />7,500.00
<br />15,000.00
<br />14
<br />F&I Drainage Structure Yard Drain
<br />3
<br />EA
<br />6.500.00
<br />'19,500.00
<br />15
<br />IF&I Drainaqe Well 15-inch HDPE
<br />447
<br />LF
<br />73.00
<br />'32,631.00
<br />16
<br />IF&I Drainage Well 12-inch HDPE
<br />56
<br />LF
<br />50.00
<br />2,800.00
<br />17
<br />IF&I Exfiltration Trench
<br />219
<br />Cy
<br />298.00
<br />55,262.00
<br />18
<br />IF&I Sidewalk
<br />341
<br />SY
<br />113.00
<br />38,533.00
<br />19
<br />IF&I T e'D' Curb
<br />345
<br />LF
<br />23.00
<br />7,935.00
<br />20
<br />IF&I Asphalt (Parking Lot & Tennis Courts
<br />1740
<br />SY
<br />68.00
<br />118.320.00
<br />21
<br />Storm Pollution Prevention Measures
<br />1
<br />LS
<br />13,800.00
<br />3,800.00
<br />22
<br />Regular Excavation (Cut)
<br />r 464 1
<br />CY
<br />138.00
<br />17,632.00
<br />Paving, Grading and Drainage Subtotall $478,913.00
<br />'WATER AND SEWER
<br />ITEM #
<br />ITEM
<br />QTY
<br />UNIT
<br />UNIT COST
<br />TOTAL
<br />23
<br />IF&1 2" Water Service HDPE
<br />122
<br />LF
<br />215.00
<br />26,230.00
<br />24
<br />IF&I 2" Irrigation Line and RPZ
<br />1
<br />LS
<br />6,500.00
<br />8,500.00
<br />25
<br />2" BFP
<br />1
<br />EA
<br />2,500.00
<br />2,500.00
<br />26
<br />:F&I 6" Sewer line PVC
<br />106
<br />LF
<br />70.00
<br />7,420.00
<br />27
<br />Cleanout
<br />4
<br />EA
<br />1,200.00
<br />Water and Sewer Subtotal
<br />$47,450.00
<br />PAVEMENT MARKING
<br />ITEM #
<br />ITEM
<br />QTY
<br />UNIT
<br />UNIT COST
<br />TOTAL
<br />28
<br />F&I Pavement Markings & Signage
<br />1
<br />LS
<br />4,500.00
<br />4,500.00
<br />Pavement Marking Subtotal
<br />$ 4,500.00
<br />HAftDSCAPE
<br />ITEM #
<br />ITEM
<br />QTY
<br />UNIT
<br />UNIT COST
<br />TOTAL
<br />29
<br />(Marble Chi /Shell Aggregate. Standard Grey Concrete. 4" thickness
<br />4,821
<br />SF
<br />30.00
<br />144,630.00
<br />30
<br />Style "B" Concrete Paver, 8"x8", Camel Shell Stone
<br />983
<br />SF
<br />9.00
<br />8,847.00
<br />31
<br />S le "C" Concrete Paver. 4"x8". Camel Shell Stone
<br />240
<br />SF
<br />11.00
<br />2,640.00
<br />32
<br />Bench: Landscape Forms -Parc Vue, Backless, 72"L x 22"W x 18"H
<br />3
<br />EA
<br />3,982.00
<br />11,946.00
<br />33
<br />LitterReceptacle: ine-mo e : - 34 (errace Trash Can), 32gal, x x
<br />38"H
<br />3
<br />EA
<br />3,108.00
<br />9,324.00
<br />34
<br />Bike Rack: Landscape Forms-Ride, 4"W x 28"L x 26"H
<br />2
<br />EA
<br />823.00
<br />1,646.00
<br />35
<br />10'HT Court Fencing, Black Vinyl Coated Chain Link. Windscreen
<br />534
<br />LF
<br />•65.00
<br />:34,710.00
<br />36
<br />Court Cabana Shade Structure, 2 post-black powdercoated frame, shade fabric, 96"L x
<br />72"W
<br />1
<br />EA
<br />19,500.00
<br />19,500.00
<br />37
<br />Tubular Barrier Gates for Entry Drive, Hoover Fence Co-"S" Series, Double gate, T47
<br />overall Length
<br />1 1
<br />EA
<br />10,200.00
<br />110,200.00
<br />
|