My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PiF CONSTRUCTION GROUP
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
PIF CONSTRUCTION GROUP
>
PiF CONSTRUCTION GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 12:07:20 PM
Creation date
9/11/2024 12:02:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provided pleasing, low-maintenance interior surfaces on the lobby floor for guests and staff. Best of all, the quality <br />of the Winston Towers 300 results led to another project for the Sika/PIF partnership. <br />Winston Towers 100 <br />Heading one of 300’s six sister complexes, the Winston Towers 100 Association summoned PIF and Sika to <br />undertake its own tile replacement. Fresh from the experience of setting the 300’s tile, the team is well prepared <br />for the job. Johnson understands that despite the buildings’ similarities, PIF knows to expect the unexpected. <br />“One of the benefits of working with Sika is if you have a jobsite condition that comes up, more than likely we <br />have a solution because of the tremendous breadth and width of our product selection.” <br />SikaTile®-800 Unsanded Grout was used in the first-floor bathroom. <br />Previous Article Next Article <br />CALL FOR NOMINATIONS ASK THE EXPERTS
The URL can be used to link to this page
Your browser does not support the video tag.