My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vercetti
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
VERCETTI ENTERPRISES
>
Vercetti
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 1:01:20 PM
Creation date
9/11/2024 12:51:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ITB #24-07-01 – Construction of Intracoastal Sports Park <br /> <br /> <br />Design-Build | Construction | General Contracting <br /> <br />RE: ITB #24-07-01 – Construction of Intracoastal Sports Park – Mobilization Narrative <br /> <br />Upon announcement of an award, our team meets together for an internal <br />preconstruction to field team transition meeting to work together as a team on the <br />creation of scope checklists, individual scope timelines, procurement of materials, <br />shop drawing and submittal logs, quantity takeoffs, and permitting. At our office, we <br />will arrange meetings with the key subcontractors to discuss the project in more <br />detail and agree on commitments. <br />We organize each of these deliverables to discuss key items during our <br />preconstruction meeting with the City of Sunny Isles Beach and the Architect during <br />the Contract Commencement. We will work together with the City of Sunny Isles <br />Beach and the Architect on coordination of the procurement phase, submittals, shop <br />drawings, permitting, the construction of building and sitework. <br />After this preconstruction meeting: <br />• We will begin to request the CAD files from the architect and civil engineer <br />begin the creation of the all submittals and shop drawings including but not <br />light fixtures, storm drainage structures, storm water well, concrete <br />reinforcement drawings, fire alarm, plumbing and mechanical systems. <br /> <br />• Onsite we will start the coordination with management to coordinate existing <br />survey to document the existing conditions, coordinate with subcontractor on <br />the requirements, perform Sunshine One Call 811 locates and underground <br />utility locates. <br /> <br />• Identify sitework construction phasing that works with the City of Sunny Isles <br />Beach and public works. <br /> <br />• Coordination of all master and subcontractor permits for the project both <br />between the City of Sunny Isles Beach and Miami-Dade County. <br />We are eager to work together with the City of Sunny Isles Beach and your <br />delegated professional team on the project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.