My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
WEST CONSTRUCTION
>
West Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 1:12:42 PM
Creation date
9/11/2024 1:09:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#Activity ID Activity Name Original Duration Start Finish Total Float <br />49 039 1ST LIFT - POUR TIE BEAM & COLUMNS 2d 27-Dec-24 30-Dec-24 0d <br />50 ROOFROOF 6d 31-Dec-24 07-Jan-25 16d <br />51 040 ROOF SLAB 3d 31-Dec-24 02-Jan-25 0d <br />52 041 INSTALL MOPPED ROOF 3d 03-Jan-25 07-Jan-25 16d <br />53 042 INSTALL ROOF CUTOUTS & EXHAUST 2d 06-Jan-25 07-Jan-25 16d <br />54 WINDOWS/DOORSWINDOWS/DOORS 5d 08-Jan-25 14-Jan-25 16d <br />55 043 INSTALL EXTERIOR WINDOWS/DOORS/LOUVERS 5d 08-Jan-25 14-Jan-25 16d <br />56 EXTERIOR FINISHESEXTERIOR FINISHES 32d 15-Jan-25 27-Feb-25 16d <br />57 044 STUCCO 10d 15-Jan-25 28-Jan-25 16d <br />58 045 PAINT & WALL PANELS 10d 29-Jan-25 11-Feb-25 16d <br />59 046 INSTALL EXTERIOR LIGHTING/SECURITY 7d 12-Feb-25 20-Feb-25 16d <br />60 047 INSTALL WALL HYDRANTS & HOSE BIBBS 2d 21-Feb-25 24-Feb-25 16d <br />61 048 INSTALL EXTERIOR SIGNS 3d 25-Feb-25 27-Feb-25 16d <br />62 Building InteriorBuilding Interior 56d 03-Jan-25 21-Mar-25 47d <br />63 BUILD OUTBUILD OUT 56d 03-Jan-25 21-Mar-25 47d <br />64 049 FIRE SPRINKLER LINES 5d 03-Jan-25 09-Jan-25 0d <br />65 050 INSTALL ABOVE CEILING INSULATION 3d 10-Jan-25 14-Jan-25 0d <br />66 051 WALL FRAMING 5d 15-Jan-25 21-Jan-25 0d <br />67 052 INTERIOR DOOR FRAMES 2d 22-Jan-25 23-Jan-25 0d <br />68 053 MEP WALL ROUGH 10d 22-Jan-25 04-Feb-25 80d <br />69 054 WALL INSULATION 2d 24-Jan-25 27-Jan-25 0d <br />70 055 INSTALL DRYWALL 3d 28-Jan-25 30-Jan-25 0d <br />71 056 DRYWALL FINISHING 3d 31-Jan-25 04-Feb-25 0d <br />72 057 ABOVE CEILING MEP ROUGH 10d 31-Jan-25 13-Feb-25 3d <br />73 058 PRIME & 1ST COAT PAINT 5d 05-Feb-25 11-Feb-25 0d <br />74 059 INSTALL AV/DATA LINES 3d 11-Feb-25 13-Feb-25 3d <br />75 060 PAINT (FINAL)5d 12-Feb-25 18-Feb-25 0d <br />76 061 INSTALL FIRE SPRINKLER HEADS 5d 14-Feb-25 20-Feb-25 3d <br />77 062 INSTALL CEILING GRID 5d 19-Feb-25 25-Feb-25 0d <br />78 063 CABINETRY 5d 19-Feb-25 25-Feb-25 5d <br />79 064 TILE (FLOOR & WALL)5d 26-Feb-25 04-Mar-25 5d <br />80 065 MEP FINAL/FIXTURES 5d 26-Feb-25 04-Mar-25 0d <br />81 066 INSTALL TOILET PARITIONS 2d 03-Mar-25 04-Mar-25 5d <br />82 067 INSTALL TOILET ACCESSORIES 2d 05-Mar-25 06-Mar-25 5d <br />83 068 ACOUSTICAL TILES 2d 05-Mar-25 06-Mar-25 0d <br />84 069 INSTALL KITCHEN EQUIPMENT & APPLIANCES 3d 05-Mar-25 07-Mar-25 8d <br />85 070 FIRE/SECURITY ACCESS CONTROLS 5d 07-Mar-25 13-Mar-25 0d <br />86 071 INSTALL CARPET TILE 3d 14-Mar-25 18-Mar-25 0d <br />87 072 INSTALL RUBBER BASE 1d 19-Mar-25 19-Mar-25 0d <br />88 073 INSTALL FIRE EQUIPMENT & SIGNS 2d 20-Mar-25 21-Mar-25 0d <br />89 Site ImprovementsSite Improvements 34d 18-Nov-24 02-Jan-25 54d <br />90 084 SHADE STRUCTURE FOOTERS 3d 18-Nov-24 20-Nov-24 55d <br />91 085 INSTALL SUBGRADE & LIMEROCK 5d 21-Nov-24 27-Nov-24 55d <br />92 086 INSTALL ASPHALT 1ST LIFT & TRAILS 2d 28-Nov-24 29-Nov-24 55d <br />93 087 INSTALL CURBS 2d 02-Dec-24 03-Dec-24 55d <br />94 088 PAVILION PAD 1d 04-Dec-24 04-Dec-24 55d <br />95 089 INSTALL SIDEWALKS 5d 05-Dec-24 11-Dec-24 55d <br />96 090 INSTALL IRRIGATION 2d 12-Dec-24 13-Dec-24 55d <br />97 091 TREES & SHRUBS 3d 16-Dec-24 18-Dec-24 57d <br />Q4 Q1 Q2 Q3 <br />2025 <br />1ST LIFT - POUR TIE BEAM & COLUMNS <br />07-Jan-25, ROOF <br />ROOF SLAB <br />INSTALL MOPPED ROOF <br />INSTALL ROOF CUTOUTS & EXHAUST <br />14-Jan-25, WINDOWS/DOORS <br />INSTALL EXTERIOR WINDOWS/DOORS/LOUVERS <br />27-Feb-25, EXTERIOR FINISHES <br />STUCCO <br />PAINT & WALL PANELS <br />INSTALL EXTERIOR LIGHTING/SECURITY <br />INSTALL WALL HYDRANTS & HOSE BIBBS <br />INSTALL EXTERIOR SIGNS <br />21-Mar-25, Building Interior <br />21-Mar-25, BUILD OUT <br />FIRE SPRINKLER LINES <br />INSTALL ABOVE CEILING INSULATION <br />WALL FRAMING <br />INTERIOR DOOR FRAMES <br />MEP WALL ROUGH <br />WALL INSULATION <br />INSTALL DRYWALL <br />DRYWALL FINISHING <br />ABOVE CEILING MEP ROUGH <br />PRIME & 1ST COAT PAINT <br />INSTALL AV/DATA LINES <br />PAINT (FINAL) <br />INSTALL FIRE SPRINKLER HEADS <br />INSTALL CEILING GRID <br />CABINETRY <br />TILE (FLOOR & WALL) <br />MEP FINAL/FIXTURES <br />INSTALL TOILET PARITIONS <br />INSTALL TOILET ACCESSORIES <br />ACOUSTICAL TILES <br />INSTALL KITCHEN EQUIPMENT & APPLIANCES <br />FIRE/SECURITY ACCESS CONTROLS <br />INSTALL CARPET TILE <br />INSTALL RUBBER BASE <br />INSTALL FIRE EQUIPMENT & SIGNS <br />02-Jan-25, Site Improvements <br />SHADE STRUCTURE FOOTERS <br />INSTALL SUBGRADE & LIMEROCK <br />INSTALL ASPHALT 1ST LIFT & TRAILS <br />INSTALL CURBS <br />PAVILION PAD <br />INSTALL SIDEWALKS <br />INSTALL IRRIGATION <br />TREES & SHRUBS <br />Intracoastal Sports Park (Sunny Isles Beach) - Bid Schedule 04-Sep-24 2 of 3 <br />Actual Level of Effort <br />Actual Work <br />Remaining Work <br />Critical Remaining Work <br />Milestone <br />summary <br />Intracoastal Sports Park (Sunny Isles Beach) - Bid Schedule <br /> <br />West Construction, Inc <br />ALL CONSTRUCTION DURATIONS ARE IN WORK DAYS UNLESS OTHERWISE NOTED <br /> <br />Data Date: 01-Oct-24 <br /> <br />Final Completion Date: 27-May-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.