My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3717
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:45:54 AM
Creation date
10/4/2024 10:52:22 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3717
Date (mm/dd/yyyy)
09/19/2024
Description
Agreement with Team Contracting, Inc. for installation of a new Pre-Engineered Metal Building.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 133446.00 <br />Work Order Title: <br />City of Sunny Isles Beach - Public Works - New metal building <br />$1,324.55 <br />Quantity Unit Price <br />Doors & Windows <br />Total <br />Installation 3.00 x 390.93 x <br />1.1294 = <br />26 13 34 19 00 0040 <br />0004 MOD For 70' To 99' In Length Only, Add <br />30 13 34 19 00 0115 EA 14'x 14' Overhead Door, Metal Frame Rough Opening <br />$3,858.48 <br />$3,056.05 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 3.00 x 901.97 x <br />Installation 4,680.00 x 0.73 x <br />1.1294 <br />3,858.48 <br />31 13 34 19 00 0117 EA >12 To 18 SF, Window Opening, Metal Frame Rough Opening <br />27 13 34 19 00 0040 <br />0010 MOD For 30 PSF Live Load And 30 PSF (110 MPH) Wind Load, Add <br />$2,813.29 <br />Quantity Unit Price <br />$28,596.41 <br />Total <br />Quantity Unit Price <br />Factor <br />Total <br />2,813.29 <br />Installation 6,000.00 x 4.22 x <br />1.1294 = <br />28,596.41 <br />$242,149.49 <br />for 170 mph wind load <br />Proposal Total <br />28 13 34 19 00 0040 <br />0013 MOD For Each SF Of 24 Gauge Wall Panel, Add <br />$261,970.46 <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />$4,114.63 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 5,280.00 x 0.69 x <br />1.1294 <br />4,114.63 <br />29 13 34 19 00 0111 EA Single Door, Metal Frame Rough Opening <br />$1,324.55 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 3.00 x 390.93 x <br />1.1294 = <br />1,324.55 <br />30 13 34 19 00 0115 EA 14'x 14' Overhead Door, Metal Frame Rough Opening <br />$3,056.05 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 3.00 x 901.97 x <br />1.1294 = <br />3,056.05 <br />31 13 34 19 00 0117 EA >12 To 18 SF, Window Opening, Metal Frame Rough Opening <br />$2,813.29 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 6.00 x 415.16 x <br />1.1294 <br />2,813.29 <br />Subtotal for Doors & Windows <br />$242,149.49 <br />Proposal Total <br />$261,970.46 <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub -totals and the proposal total is due to rounding. <br />The Percentage of NPP on this Proposal: % <br />Contractor's Price Proposal - Detail Page 3 of 3 <br />9/10/2024 <br />308 <br />
The URL can be used to link to this page
Your browser does not support the video tag.