Laserfiche WebLink
issued deducting from the Contract Price the cost of correcting the subject deficiencies, plus <br />compensation for the Engineer /Architect's additional services and expenses necessitated thereby, if <br />any. If the unpaid portion of the Contract Price is insufficient to cover the amount due the City, the <br />Contractor shall pay the difference to the City. <br />6.4 Inspections <br />6.4.1. No inspector shall have authority to waive any requirements of the Contract <br />Documents. Any failure or omission on the part of any inspector, the Engineer / Architect or any <br />agent of the City, to condemn any defective work or material shall not release the Contractor from <br />its obligations to install the Work free from faults and defects and to promptly remove and repair <br />any defective or deficient work. The Contractor hereby acknowledges and agrees that no inspector <br />shall have authority to: <br />(a) Authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment; <br />(b) Undertake any of the responsibilities of the Contractor, subcontractors or <br />Contractor's superintendent; <br />(c) Expedite the Work for the Contractor; <br />(d) Advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically <br />called for in the Contract Documents; <br />(e) Advise on or issue directions as to safety precautions and programs in <br />connection with the Work. Provided however, this shall not preclude the City <br />inspector from notifying the Contractor of any hazardous or dangerous <br />condition; <br />(f) Participate in specialized field or laboratory tests. <br />6.5 Not Applicable and Omitted <br />6.6 Coordination and Scheduling of Work <br />6.6.1. The Contractor shall cooperate with the City and any separate contractors retained by <br />the City, and the Contractor shall carefully coordinate and schedule the Work as may be required to <br />accommodate without delay or interference the Work of the City or any of its separate contractors. <br />6.7 Contractor Responsible for Delays <br />6.7.1. The Contractor shall be responsible for any damages caused to the City as a result of <br />any delays caused by the Contractor. <br />MBR CONSTRUCTION, INC. Page 12 of 41 <br />161 <br />