Laserfiche WebLink
7.14 Indemnity <br />7.14.1. To the fullest extent permitted by law, Contractor shall indemnify and hold harmless <br />City, its officers and employees, from liabilities, damages, losses, and costs, including, but not <br />limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness or <br />intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in <br />the performance of this Contract. This indemnification shall survive the term of this Contract. <br />7.15 Value EnOneerina Incentive <br />7.15.1. The City encourages the Contractor to make timely value engineering and cost <br />savings recommendations. In the event the City approves by duly executed change order any value <br />engineering or cost savings recommendation of the Contractor, and in the further event the Contract <br />Sum is reduced thereby, any savings shall be shared with Seventy -Five Percent (75%) being <br />allocated City and Twenty -Five Percent (25%) being allocated to the Contractor. It is agreed, <br />however, that the Contractor shall procure and obtain at its sole cost and expense all change orders, <br />drawings, specifications, permits, approvals, or other documents required in order to implement the <br />value engineering or cost savings recommdation. ANY CLAIM UNDER THIS PARAGRAPH <br />MUST BE SUBMITTED IN WRITING TO THE CITY AND THE ENGINEER / ARCHITECT <br />PRIOR TO THE EXECUTION OF THE CHANGE ORDER INCORPORATING THE <br />CONTRACTOR'S RECOMMENDATION OTHERWISE SAID CLAIM IS EXPRESSLY <br />WAIVED. Any savings allocated to the Contractor under this Paragraph shall be paid at the time of <br />Final Payment to the Contractor. <br />7.16 Miscellaneous <br />7.16.1. Prior to commencement of the Work, the Contractor shall submit to the City a plan <br />for site access and control of construction traffic. Said plan shall include, but not be limited to, an <br />enumeration of each construction access point to the site and a description of how access will be <br />controlled and regulated; a description of any impact that construction traffic may have on the public <br />streets and highways, and the Contractor's plan for minimizing and reducing such impact; and, the <br />name and address of the individual employed by the Contractor who shall have responsibility for <br />control and management of construction traffic. Approval by the City of this plan is a condition <br />precedent to payment of any sums to the Contractor. The Contractor furthermore agrees to cooperate <br />with the City and all other appropriate governmental entities with respect to the control, regulation, <br />scheduling and management of construction traffic. <br />7.16.2. The Contractor shall be responsible for, and shall pay the cost of, all temporary <br />facilities used, or made available, during the course of the Work. These facilities include, but shall <br />not be limited to, electric power, gas, water, sewage and sanitation, waste removal and disposal, <br />telephone, and temporary office facilities. The Contractor shall timely pay for all such temporary <br />facilities and shall coordinate the installation and removal of such facilities including, but not limited <br />to, any required coordination with any utility company. Furthermore, the Contractor shall be <br />responsible for, and shall pay the cost of, any utility work which may be necessary in order to <br />perform the Work required by the Contract Documents; this responsibility includes, but is not limited <br />to, the cost of installing, moving, or relocating electric, water, sewer, gas, or other utility lines, wires, <br />poles, pipe, and any other equipment of every kind and nature. <br />MBR CONSTRUCTION, INC. Page 17 of 41 <br />166 <br />