My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3732
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 9:49:44 AM
Creation date
10/30/2024 4:05:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3732
Date (mm/dd/yyyy)
10/22/2024
Description
AWD Bid 24-07-02; Agreement w/ MBR Construction, Inc. to provide construction services for the Intracoastal Sports Park.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sum of material and labor costs as defined under Material costs and Labor <br />costs below, but excluding equipment rental costs and bond allowance. <br />(d) Contractor's overhead, including general supervision and the furnishing, use <br />and maintenance of small tools and equipment incidental to and required for <br />the Work accomplished by subcontractors shall be considered to be just and <br />fully compensated for by adding an amount equal to FIVE PERCENT (5%) <br />of the sum of material and labor costs as defined under Material costs and <br />Labor costs below, but excluding equipment rental costs and bond allowance. <br />(e) Contractor's profit may then be added into the above material costs and labor <br />costs, including the Overhead allowance at the rate of SEVEN PERCENT <br />(7%) of the sum of those costs, excluding equipment rental costs. <br />10.3.3.5. Bond Allowance: For maintaining the Public Construction Bond at 100% of the <br />Contract Price, a sum of ONE PERCENT (1%) of the total cost of the change (including material, <br />labor, overhead and profit, and equipment rental) shall be allowed on all change orders. <br />10.3.3.6. Material costs actually recorded by the Contractor and the subcontractor as materials <br />are delivered to the site and, as evidenced from originally receipted invoices, listing appropriate <br />quantities and unit prices. Records in proper form shall be maintained and made available to the <br />Engineer / Architect and the City at all times. <br />10.3.3.7. Labor Costs represented by the actual wages paid to all laborers, apprentices, <br />journeymen, and foremen involved in and necessary to completing the particular construction <br />operations, for each day and every hour such labor teams and foremen are actually employed on the <br />extra work required, including the net cost of insurance, social security and Workmen's <br />Compensation. Records in proper form shall be maintained and be made available to the Engineer / <br />Architect and the City at all times. <br />10.3.3.8. Rentals for special equipment or machinery such as power driven roller, tractors, <br />trucks, shovels, drills, mixers, pumps, hoists, etc. required for the economical performance of the <br />work at reasonable rental prices agreed upon before work commences, shall be allowed the <br />Contractor and subcontractors by the Engineer / Architect and the City for each and every hour such <br />special equipment is in use on the particular work. To the sum of such equipment rentals, no <br />additional percentage shall be added. <br />10.3.3.9. Owned Equipment for certain owned heavy or specialized equipment (defined as <br />tools and equipment with an individual purchase cost of more than One Thousand Dollars ($1000)) <br />brought on to the job site specifically for change order work shall be valued at 75 percent of the <br />monthly rental divided by 176 to arrive at a maximum hourly rate to be applied to the hours the <br />equipment is used performing the change order work. Fuel and an operator necessary to utilize the <br />equipment will be considered as a separate direct cost associated with the change order work. No <br />recovery will be allowed for heavy or specialized equipment that is already on the jobsite and is <br />necessary to complete work of the original contract. No recovery will be allowed for hand tools, <br />power tools, minor equipment, work vehicles (including pickup trucks and cargo vans), simple <br />scaffolds, etc. The longest period of time that the equipment is to be required for the work will be <br />the basis for pricing. Downtime due to repairs, maintenance and weather delays will not be allowed. <br />MBR CONSTRUCTION, INC. Page 24 of 41 <br />173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.