Laserfiche WebLink
Heavy Duty Basketball Goal/Backboard: Sports Play, Inc., Bent Post, 4-1/2" Gal Steel <br />382 <br />Post, 72" x 48" Acrylic Backboard <br />EA <br />Tennis/Multi-Court Surfacing: Sportsmaster Sports Surfacing, standard court system on <br />3912,084 <br />Asphalt <br />SF <br />Hardscape Subtotal <br />$ <br />LANDSCAPE <br />ITEM #ITEMQTYUNITUNIT COSTTOTAL <br />TREES <br />407 <br />Bursera simaruba - Gumbo LimboEA <br />416 <br />Conocarpus erectus - Green ButtonwoodEA <br />427 <br />Simaruba glauca - Paradise TreeEA <br />PALMS <br />2 <br />43Phoenix dactylifera - date palm: matchingEA <br />2 <br />44Sabal palmetto - Cabbage PalmEA <br />14 <br />45Satakentia liukiuensis - Satake PalmEA <br />4 <br />46Veitchia montgomeryana - Montgomery PalmEA <br />SHRUBS <br />47Brunfelsia grandiflora - Yesterday, Today & Tomorrow39EA <br />48 <br />Chrysobalanus icaco "Horizontalis" - Horozontal Cocoplum48EA <br />49 <br />Chrysobalanus icaco "Red Tip" - Red Tip Cocoplum105EA <br />5026 <br />Conocarpus erectus - Green ButtonwoodEA <br />51962 <br />Ficus microcarpa "Green Island" - Green Island FicusEA <br />52188 <br />Pennisetum setaceum "Alba" - White Fountain GrassEA <br />5380 <br />Zamia pumilla - CoontieEA <br />548,000 <br />Stenotaphrum secundastum - St. Augustine GrassSF <br />SOIL AND MULCH <br />55144 <br />Planting Soil (6" depth)CY <br />5633 <br />Mulch (3" depth)CY <br />Landscape Subtotal <br />$ <br />IRRIGATION <br />ITEM #ITEMQTYUNITUNIT COSTTOTAL <br />5754 <br />Irrigation spray heads, nozzles, swing joints, & fittingsEA <br />5843 <br />Bubblers, swing joints, & fittingsEA <br />5946 <br />Rotors, swing joints, & fittingsEA <br />607 <br />Zone valve assembly & valve boxEA <br />611 <br />ControllerEA <br />623,207 <br />Lateral pipeLF <br />63340 <br />MainlineLF <br />6480 <br />SleevesLF <br />Irrigation Subtotal <br />$ <br />SITE LIGHTING & ELECTRICAL <br />ITEM #ITEMQTYUNIT UNIT COSTTOTAL <br />65Tennis Court Sports Lighting1LS <br />66Parking lot & site light poles, underground feeders, & lighting controls1LS <br />Site Lighting & Electrical Subtotal <br />$ <br />$ <br /> SITE WORK GRAND SUB-TOTAL: <br /> <br />NOTES: <br />1. Quantieis were calculated based on construction document plan set dated 7/03/2024. <br />SITE RELATED SCOPE <br />ITEM # <br />QTYUNITUNIT COSTTOTAL <br />1.00 <br />SPECIALTY EQUIPMENT <br />Not used <br />1.01 <br />SUBTOTAL $ <br />2.00 <br />EXISTING CONDITIONS/SITEWORK <br /> <br />