Laserfiche WebLink
Docusign Envelope ID: B9945E53-54BB-436D-B4C0-4D5567EDE5B6 <br />July 18, 2024 / Page 12 of 14 <br />11723.06 — Town Center Park Playground Renovation <br />City of Sunny Isles Beach <br />PROJECT SCHEDULE <br />Subsequent to the issuance of a Purchase Order from the CITY, CONSULTANT shall commence <br />work on the project. We anticipate commencing work within 5 business days from notice to <br />proceed, completing the prescribed work within 1 year. <br />Table 1 Schedule Estimate of Engineering Services <br />5ZI <br />Engineering Inspired Design. 129 <br />TASK <br />DURATION <br />Task 001 <br />Team Meetings & Meetings with Government Agencies <br />/ Permit Authorities <br />Duration <br />Task 101 <br />Boundary and Topographic Survey <br />2 Months <br />Task 301 <br />Conceptual Design <br />2 Months <br />Task 302 <br />Site Plan Preparation and Processing <br />3-4 Months <br />Task 401 <br />Preliminary Engineering / Design Development (DD) <br />2 Months <br />Task 402 <br />Construction Documents (CD) — Final Engineering <br />2-3 Months <br />Task 403 <br />Engineering Permitting <br />4-6 Months <br />Task 501 <br />Electrical Engineering Construction Documents <br />(By Electrical Subconsultant - SDM) <br />3-4 Months <br />Task 701 <br />Preliminary Landscape / Design Development (DD) <br />2 Months <br />Task 702 <br />Tree Inventory and Appraisal by Certified Arborist <br />1 Month <br />Task 703 <br />Construction Documents (CD) — Final Landscape <br />2-3 Months <br />Task 704 <br />Landscape Permitting <br />1 Month <br />Task 801 <br />Bidding, Cost Estimate, and Selection Assistance <br />2 Months <br />Task 802 <br />Construction Administration <br />10 Months <br />5ZI <br />Engineering Inspired Design. 129 <br />