My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3713
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 8:52:03 AM
Creation date
11/12/2024 9:54:45 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3713
Date (mm/dd/yyyy)
09/19/2024
Description
ITB 24-06-02, Agreement w/ VisualScape, Inc. to provide Citywide Landscaping Services as the Primary Awardee.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />2.36 EMERGENCY RESPONSE PLAN <br />The Contractor must prepare and furnish to the Project Manager(s) for review and acceptance an <br />Emergency Response Plan (“ERP”) within thirty (30) days after execution of the Contract. The ERP <br />must outline the Contractor’s response procedures in the event of an emergency, damage, or <br />adverse weather conditions including hurricanes, rain, high winds, or flooding. The ERP must <br />address the Contractor’s coordination procedures with the City. <br /> <br />The ERP must include a provision for cooperating with the City to furnish Contractor’s forces to <br />supplement the City’s staff in hurricane preparedness, evacuation plans, and hurricane disaster <br />response of the disaster event within the project limits. In such event that services or equipment <br />will be deemed as Supplemental Services and paid for in accordance with Section 7 of the <br />Contract. <br /> <br />2.37 PRIORITY <br />The Contractor, on an immediate and first priority basis, shall make available all its resources and <br />equipment to the City in the event of an Act of God (i.e. storm, tornado, or hurricane) or an auto <br />accident that causes a tree to fall and block a roadway or pedestrian area, or any other emergency <br />deemed by the City Manager or his designee. Work may include but is not limited to roadway <br />clearing, extensive clean-up and disposal activities. All debris removed from the City will be legally <br />st <br />disposed of at an EPA and/or City approved dump site. Each May 1, the Contractor shall submit, <br />for City approval, an Emergency Response Plan. <br /> <br />2.38 UNSATISFACTORY WORK TO BE CORRECTED BY THE CONTRACTOR <br />The Contractor shall promptly correct all apparent and latent deficiencies and/or defects in work, <br />and/or any Unsatisfactory Work that fails to conform to the contract documents regardless of <br />project completion status. If Unsatisfactory Work is identified, through planned, random or <br />unannounced inspections, or any other circumstance through which the City becomes aware of <br />non-Compliant Work, the Contractor will be notified in writing within two (2) business days. All <br />corrections shall be made within two (2) business days after such rejected defects, deficiencies, <br />and/or Non-Compliant Work are verbally reported to the Contractor by the City's Project <br />Manager(s), who may confirm all such verbal reports in writing. The Contractor shall bear all costs <br />of correcting such rejected work. If the Contractor fails to correct the work within the period <br />specified, the City may, at its discretion, notify the Contractor, in writing, that the Contractor is <br />subject to contractual default provisions if the corrections are not completed to the satisfaction <br />of the City within one (1) business day of receipt of the notice. If the Contractor fails to correct <br />the work within the period specified in the notice, the City may place the Bidder in default. <br /> <br />In addition to random or unannounced inspections, the City will conduct planned inspections, one <br />for parks and facilities and one for rights-of-way each month, which will be conducted prior to the <br />Contractor submitting its monthly invoice. When either planned or unplanned inspection efforts <br />identify Non-Compliant Work or Unsatisfactory Work, the Contractor will be notified per the <br />procedure set forth above and the City will conduct a subsequent inspection to ensure <br />compliance. The City will incur additional administrative expenses for the additional time <br />required to re-inspect Contractor Work. Upon failure of CONTRACTOR to complete the Work <br />ITB 24-06-02 CITYWIDE LANDSCAPING SERVICES 32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.