Laserfiche WebLink
Summary Minutes: Special City Commission Meeting September 11, 2013 Sunny Isles Beach, Florida <br />Ida Curtis said we are doing a renovation to Samson Oceanfront Park and adding a few <br />elements to increase the functionality of the Park. Such as what you see on the north end we <br />have a covered stage for performances or concerts. We are also adding the covered <br />playground for different ages. We are putting in the stage, the grating is going to be very <br />simplified like before. We are adding some seating areas. We are reconfiguring the inside of <br />the bathrooms and adding stalls, moving the shower from the beachside closer to where the <br />bathrooms are. We are adding a cleanup area for the maintenance vehicles so they can douse <br />off when they are coming from the beach. At the entrance we are reconfiguring a little bit, <br />modifying the wall so it is a more can y linear and centering the name of the Park and kind of <br />refinishing some of the walls so it would have the more art deco look of what the building is. <br />It is a really special Park and we are maintaining the character as it is one of the few ones but <br />it is still Art Deco, the landscaping is very simple and we are going to be matching what is on <br />the south side pretty much with the same pallet of the native coconut palms and a lot of the <br />native vegetation. <br />Vice Mayor Aelion asked about the new playground, you said covered, does that mean there <br />will be a canopy? Ms. Curtis said the cover that is proposed for the playground is similar to <br />the concrete cover that is there right now for the picnic shelter. We are keeping that same <br />look and we are putting one on the playground and one on the stage. Vice Mayor Aelion said <br />then that it is an extension of the existing cover that is on the picnic area. City Manager <br />Russo said it is not an extension it will be its own independent cover but it will be the <br />concrete which is a substantial change, and it will be over the stage and the playground. <br />Commissioner Levin asked what the two different colors are the blue and the yellow over the <br />playground? Ms. Curtis said that would be the surfacing of the playground, wejust rendered <br />it so that you would know that is the different surfacing than the surfacing of the walkway, <br />and the cover goes all the way around. <br />Vice Mayor Aelion said the existing children's equipment in the play area, that remains <br />because it is written here rubber surface, new concrete shade structure and new playground, it <br />includes new equipment, and Ms. Curtis said that is correct. Vice Mayor Aelion said he <br />understands the complete playground would be built by Chateau? Ms. Curtis said yes on the <br />north side. Vice Mayor Aelion said the southern part, the new 6 -foot ornamental black <br />picket fence, is there an existing fence there now? Ms. Curtis said yes but it will be upgraded <br />like the fence at Town Center Park. Vice Mayor Aelion asked if there is a pump there now, <br />and Javier Rodriguez said there is no pump now. City Manager Russo said that is part of the <br />problem with the sewer system, we are replacing the entire sewer system in that Park as well <br />as the electrical system. Vice Mayor Aelion said the costs for these total improvements, it is <br />going to be bourn by the developer, and City Manager Russo said we are working on our <br />final cost estimate on this because we have substantially changed a few things here. The <br />biggest changes are these solid concrete covers, the sewer system, the electrical system, the <br />expansion of the bathrooms, those are probably the biggest expense items here. We have an <br />Agreement with the Chateau Group to pay for certain aspects of the improvements pretty <br />much the area that covers where they were, the third of the Park that we had given them for <br />staging. What we are doing right now, and don't forget that they have also given us <br />3 <br />