My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3716
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:50:54 PM
Creation date
12/17/2024 2:26:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3716
Date (mm/dd/yyyy)
09/19/2024
Description
Approving agreement w/ Schindler Elevator Corp., replacement of elevators at Pedestrian Overpass Bridge at Gateway Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 41 F63DOF-3BC8-4149-8618-1 BBEEF49D6F7 <br />Aff Obsolescence Challenges <br />All mechanical and electrical components wear with use over time. For this reason, we only see automobiles <br />over 25 years old in the classic car grouping. The computer age brought us great advancements which have <br />accelerated rapidly over the past 10 years pushing many older computer technologies to the side. In similar <br />fashion, elevators over 25 years old face these same challenges. The above noted mechanical and electrical <br />systems over 25 years old pose many of the following issues: <br />• Reliability Challenges <br />• Higher maintenance costs <br />• Limited or rebuilt only parts availability <br />• Higher potential liability exposure <br />• Higher operating costs <br />AV Schindler's Unique Offer <br />Schindler values our relationships with all our customers and works to provide creative solutions to our <br />customers which benefit both the customer and Schindler. Our traction elevator modernization package offer <br />is one such unique opportunity for Schindler to partner with you, our customer. We understand the cost of an <br />elevator modernization along with the other building cost upgrades required with a modernization can be a <br />serious burden on a property <br />60- or72-month payment options for those with approved credit. <br />Schindler TX package provides an industry leading control and drive system, greatly improved energy <br />efficiency, reliability and ride quality. <br />© COPYRIGHT 2019 1 ALL RIGHTS RESERVFD <br />
The URL can be used to link to this page
Your browser does not support the video tag.