Laserfiche WebLink
Docusign Envelope ID: 41 F63DOF-3BC8-4149-8618-1 BBEEF49D6F7 <br />subject Schindler Elevator Modernization Proposal - LSUN-D5PJUJ <br />Page 15 of 31 <br />Date 6/4/2024 <br />Related Work by Others Scope Included in Proposal <br />Electrical Work <br />• Furnish and install LED light fixtures in the elevator machine rooms. All lighting in the machine room shall meet 19 -foot <br />candles in all areas. <br />• Replace three-phase mainline disconnect in the elevator machine room. <br />• Furnish and install electrical conduits and wires from the load side of the disconnect to the new elevator controller. <br />• Provide auxiliary contacts for the battery lowering system to new disconnect <br />• Replace cab lights disconnect, provide new conduits and wires from the load side of the disconnect to the new elevator <br />controller. <br />• Provide new GFCI convenience outlets in the Machine Room. <br />• Provide new LED light fixtures in the elevator pit. All lighting in the pit shall meet 10 -foot candles in all areas. <br />• Provide GFCI convenience outlets in the pits. <br />• Provide proper "earth" ground to the new elevator control equipment <br />• Re -use existing main feeders <br />• Install new phone line conduit to elevator controllers <br />• Label all disconnects with source ID <br />• Permits, drawings and Inspections included <br />Mechanical HVAC Work <br />• Provide an air conditioning system in the elevator machine rooms capable of handling the heat loads for these elevators. <br />• Install TWO (2) 1 Ton 12000 BTU'S mini -split units. <br />• Install new drain and refrigeration lines with covers. <br />• Install new condensing units with aluminum brackets and SS hardware. <br />• Fire caulking all penetrations in machine room. <br />• Traveling and lodging is included. <br />• Permits, drawings, coordination and inspections included. <br />General Contracting Work <br />• Provide code compliance machine room door. <br />• Waterproof pit. <br />• Paint machine room ceiling, walls and floor. <br />• Patch hoist way for code compliance. <br />• Work to be perform under Elevator company master permit. <br />Fire Alarm Work <br />• Provide alarm initiating signal wiring to the elevator controller in the machine room that is separated into, <br />(1) primary recall operation <br />(2) secondary recall operation <br />(3) flashing fire hat. <br />• Provide all required code reviews, permits and inspection for a complete system that will initiate fire service recall as <br />required by code. <br />• Add a heat detector in the elevator pit next to sprinkler <br />• Programing, testing and inspection of all new devices included <br />Electrical/Mechanical Engineer Drawings <br />• Survey project with electrical engineer to create electrical and mechanical drawings to pull elevator permit. <br />