My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3716
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:50:54 PM
Creation date
12/17/2024 2:26:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3716
Date (mm/dd/yyyy)
09/19/2024
Description
Approving agreement w/ Schindler Elevator Corp., replacement of elevators at Pedestrian Overpass Bridge at Gateway Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 41 F63DOF-3BC8-4149-8618-1 BBEEF49D6F7 <br />Subject Schindler Elevator Modernization Proposal - LSUN-DSPJUJ <br />Page 25 of 31 <br />Date 6/4/2024 <br />General Terms and Conditions <br />The price quoted in Article 1 above is based upon all the work being performed during our regular working <br />hours of regular working days. If overtime is required, the additional price usually charged by us shall be <br />added to the contract price. Your advance approval in writing is required before we will schedule or perform <br />any overtime work. <br />2. The equipment furnished hereunder remains personal property and we retain title thereto until final payment <br />is made, with the right to retake possession of the same at the cost of the Purchaser if default is made in <br />any of the payments, irrespective of the manner of attachment to the realty, the acceptance of notes, or the <br />sale, mortgage or lease of the premises. <br />The completion of the work as covered by this Agreement or acceptance thereof shall constitute a waiver <br />by you of all claims for loss or damage due to delay. It is also understood and agreed that we shall not be <br />liable for the condition, design, application or compliance with acceptable codes of any equipment not <br />furnished under this Agreement or for the omission of any work or equipment not covered by this Agreement. <br />We reserve the right to remove and retain all equipment that has been replaced or new materials not used <br />in construction. <br />4. Schindler reserves the right to furnish its most modern of equipment and no statements contained in this <br />contract are to make it obligatory for us to furnish equipment, the design of which has been discontinued or <br />supplanted by new standards or codes. <br />5. All previous communication between us, whether written or verbal, with reference to the subject matter of <br />this Agreement, is hereby abrogated, and this contract when duly accepted and approved constitutes the <br />agreement between us, and no modification of this agreement shall be binding upon the Purchaser or <br />Schindler, or either of us, unless such modification shall be in writing, duly accepted by the Purchaser and <br />approved by Schindler. The contract date shall be the date of approval by Schindler. <br />6. The Purchaser is to provide suitable connections from the power mains to the controller, together with any <br />cutouts, line switches, phase reversal or lightning arresters, and any other such components as that may <br />be necessary to meet purchaser and/ or local code requirements. <br />Any changes in the building required to meet any local or state building or electrical codes are to be made <br />by the Purchaser. Any cutting or patching necessary for the installation of equipment furnished under this <br />contract shall be done by the Purchaser. Schindler shall not under any circumstances be liable for any <br />redecorating that may be necessary upon the completion of its work. No work or service other than that <br />specifically mentioned herein is included or intended. Such work by others must be coordinated by <br />Purchase with Schindler in order to avoid delays to Schindler's work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.