Laserfiche WebLink
f) i ilk �4 <br />Electric INC. <br />FOR <br />City Of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach FL 33160 <br />United States <br />convert to underground the houses in golden shores <br />QUOTE <br />IAM ELECTRIC INC <br />1 i2 TERRA, -,E <br />t•,lianu Fl_ ",315% <br />'.Hued States <br />ig^aci� ��an �clect; icux:i[p,�_�+��nacr,m <br />Quote No.: 165 <br />Issue date: 1/9/2025 <br />Valid until 2/9/2025 <br />DE�CRIRTION fU�r(TITYI'UNITrR�t((3Fs'($�' I`►jIOUNTi(�� <br />DESCRIPTION OF THE JOB <br />SCOPE OF WORK <br />connect the existing underground polypipe from the ground level to the meter can <br />in the required locations install PVC junction boxes and run PVC SCH 80 from the new junction <br />box to the existing meter can <br />NOTES <br />- this quote is only for permits, labor, and equipments <br />-if something is required to do what is not included in the scope of work will be charged at the <br />same labor and equipment rate separate (example ) replace meter can , do new grounding system <br />relocate the meter can or electrical panel etc <br />permits fees or process fees not included in this estimate <br />the contractor will provide the license and the sign to pull the required permits but will no be <br />present at the inspection or process to pull permits <br />- if any deficiency if found for part of the city or utility company in any of the existing installation . <br />To correct that the contractor will charge at the same labor and equipment rate <br />- no materials included in this estimate <br />-if this quote is approved we require 30% down payment before the project starts <br />LABOR AND EQUIPMENT <br />-UE 20001-1 x 43$/H =. 86000$ <br />-E/H 2O00H x (5) x 25$ x H =2500005 <br />-BiT I OOOH x 36$/H = 36000$ <br />TOTAL (USD): <br />372,000.00 372,000.00 <br />$372,000.00 <br />