My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 095113-6 <br />2. Acoustical panels with BioBlock® performance: growth of mold and mildew <br />3. Grid System: rusting and manufacturer's defects <br />B. Warranty Period: <br />1. Ceiling System: Thirty (30) years from date of substantial completion <br />C. The Warranty shall not deprive the Owner of other rights the Owner may have under other <br />provisions of the Contract Documents and will be in addition to and run concurrent with other <br />warranties made by the Contractor under the requirements of the Contract D ocuments. <br /> <br />1.12 MAINTENANCE <br />A. Extra Materials: Deliver extra materials to Owner. Furnish extra materials described below that <br />match products installed. Packaged with protective covering for storage and identified with <br />appropriate labels. <br />1. Acoustical Ceiling Units: Furnish quality of full-size units equal to 5.0 percent of amount <br />installed. <br />2. Exposed Suspension System Components: Furnish quantity of each exposed suspension <br />component equal to 2.0 percent of amount installed. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.