My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 095126-7 <br />3.1 EXAMINATION <br />a) Do not proceed with installation until all wet work such as concrete, terrazzo, <br />plastering and painting has been completed and thoroughly dried out. <br />b) Proper designs for both supply air and return air, maintenance of the HVAC filters <br />and building interior space are essential to minimize soiling. Before starting the HVAC <br />system, make sure supply air is properly filtered and the building interior is free o f <br />construction dust. <br />3.2 PREPARATION <br />a) Measure each ceiling area and establish layout of acoustical units to balance border <br />widths at opposite edges of each ceiling. Avoid use of less than half width units at <br />borders and comply with reflected ceiling plans. Coordinate panel layout with <br />mechanical and electrical fixtures. <br />b) WoodWorks ceiling materials should be permitted to reach room temperature and <br />have a stabilized moisture content for a minimum of 72 hours before installation. <br />(Remove plastic wrap to allow panels to climatize). <br />3.3 INSTALLATION <br />a) Interior WoodWorks products, the veneered wood panels are designed for <br />installation in temperature conditions between 50 degrees F and 86 degrees F, in <br />spaces where the building is enclosed, and HVAC systems are functioning and will be <br />in continuous operation. Relative humidity should not fall below 25 percent or exceed <br />55 percent. <br />b) Install suspension system and panels in compliance with ASTM C636, ASTM E580, <br />with the approval of the authorities having jurisdiction, and in accordance with the <br />manufacturer’s WoodWorks Linear Veneered Panels Installation Instructions. <br />3.4 ADJUSTING AND CLEANING <br />a) Replace damaged and broken panels. <br />b) Clean exposed surfaces of ceilings panels, including trim, edge moldings, and <br />suspension members. Comply with manufacturer’s instructions for cleaning and touch <br />up of minor finish damage. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.