My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
97 Olexandr <br />Kaltsev A-700 CIVIL/ <br />ARCHITECTURE <br />Utility Conflicts and Foundation Penetrations - The gas and electrical lines are <br />running close to the proposed helical piers in certain locations, which could lead <br />to conflicts during installation . Can a revised plan be issued showing coordinated <br />utility and foundation layouts to avoid conflicts? Are there required clearances <br />between utilities and deep foundation elements that must be maintained? Will <br />utility relocations or protective encasements be needed where crossings occur? <br />Gas and electrical are shown as diagramatic routes, gas line final coordination <br />shall be as per gas company requirements. Electrical line shall maintain 3' <br />distance minimum from structural foundation. <br />98 Olexandr <br />Kaltsev S-2.0 STRUCTURAL <br />Structural Foundation Plan Detail - The foundation plan does not clearly indicate <br />the depth of footings in certain locations. It is unclear whether all footings follow <br />the same depth or if variations exist. Please confirm if the depth of footings is <br />uniform throughout or if variations apply, and provide necessary dimensions. <br />All existing footing are at an elevation of -2'-0" (VIF). <br />99 Olexandr <br />Kaltsev AD-101 ARCHITECTURE At restroom locations shows Note #28. Is there an existing bollard in the <br />restroom? A-006 Existing Interior Conditions do not show a bollard. Please clarify.Refer to revised AD-101, new note: See Note #38 <br />100 Olexandr <br />Kaltsev A-104 ARCHITECTURE <br />Missing Sheet - General Notes 1 on Sheet A-104 states see Sheet A-509 for Roof <br />Patching Details. Details 1, 2, 4 and 5 on Sheet A-508 state Metal Counter <br />Flashing See: A-509/6. Please provide sheet A-509. If not available, please <br />provide related details. <br />Refer to revised sheet A-104 for revised general note #1. See Sheet A-508 Detail <br />9 for Roof Patching Details. <br />101 Olexandr <br />Kaltsev A-104 ARCHITECTURE <br />Splash Block Specifications - Note 5 on Sheet A-104 states to provide splash <br />blocks. Please provide specifications on splash blocks; concrete, stone, vinyl, <br />rubber, etc. <br />Concrete Splash Blocks - Refer to revised Note #5 on Sheet A-104 <br />102 Olexandr <br />Kaltsev ARCHITECTURE <br />TPO Roofing Specifications - TPO NOA Received: Please provide: <br />- Desired brand and model of the TPO membrane <br />- Thickness (e.g., 45, 60, or 80 mil) <br />- Color options <br />- Warranty coverage <br />- Insulation type <br />- TPO attachment method <br />- Desired brand and model of the TPO membrane: GAF EverGaurd Freedom TPO <br />HW SIngle Ply Roofing System over Steel Decks <br />- Thickness (e.g., 45, 60, or 80 mil) - 80mil <br />- Color options - White <br />- Warranty coverage - 20 Year <br />- Insulation type - Polyiso Rigid Insulation <br />- TPO attachment method - Self Adhered <br />Or Similar approved. Refer to revised Sheet A-104
The URL can be used to link to this page
Your browser does not support the video tag.