My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br />Project No. 21-1011 November 2024 011100 Summary-2 <br /> <br />D. Rodent and Pest Control: Provide control measures to keep snakes, rodents, birds, and <br />other animals from nesting in the building(s) and storage areas during the construction <br />period <br /> <br />1. Provide localized control measures to eliminate all outbreaks of insect infestation <br />such as ant colonies, hornet nests, or bee hives during the construction period. <br />2. Use only chemicals that bear a federal registration number of the U.S. <br />Environmental Protection Agency. <br />3. Employ methods that will not adversely affect the site or any adjacent sites. <br /> <br />1.3 GRADES, LINES, LEVELS <br /> <br />A. Information pertaining to preliminary investigations, such as test borings, location of <br />utilities, existing structures, and existing grades appear in the Project Manual or on the <br />Drawings. While such data has been collected with reasonable care, there is no expressed <br />or implied guarantee that conditions so indicated are entirely representative of those <br />actually existing or that unforeseen developments may not occur. Where underground <br />services, utilities, and structures are located on the Drawings or given at the site, they are <br />based on available records, but are not guaranteed to be complete or correct. <br /> <br />B. Locate general reference points and take action necessary to prevent destruction. Lay out <br />work for all lines, elevations, and measurements of the building, utilities, and other Work. <br />Exercise precaution to verify Drawings before laying out work. <br /> <br />C. Using datum furnished by the Owner, the lot lines and present levels have been established <br />and shown on the Drawings. Other grades, lines levels, and bench marks must be <br />established as part of the Work. <br /> <br />D. Provide stake-out and grade staking for all work from reference points provided. Establish <br />all grades, lines, levels, and elevations required for work from on-site reference points. <br /> <br />E. Preserve property line stakes, bench marks, or datum point. Replace if any are lost, <br />displaced, or disturbed through neglect. <br /> <br />F. Verify grades, lines, levels, locations, and dimensions as shown on Drawings, and report <br />any errors or inconsistencies to the Architect before commencing work. Starting of work <br />shall signify acceptance. <br /> <br />1.4 TAXES <br /> <br />A. Taxes which are legally enacted at the time bids are received, whether or not effective, <br />shall be paid by the contractor. <br /> <br />1.5 PERMITS, FEES, AND NOTICES <br /> <br />A. Secure the general building permit. Secure other permits, governmental fees, parking, and <br />licenses necessary for the execution and completion of the Work. Fees to relocate utilities <br />on Owner's property shall be included in the bid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.