My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 031000 -13 <br />2. Removable Ties: Where taper ties are approved for use, the larger end of the <br />taper tie shall be on the wet side of walls in water retaining structures. After the <br />taper tie is removed, the hole shall be thoroughly cleaned and roughened for bond. <br />A precast neoprene or polyurethane tapered plug shall be located at the wall <br />centerline. The hole shall be completely filled with non-shrink grout for water <br />bearing and below-grade walls. The hole shall be completely filled with non-shrink <br />or regular cement grout for above-grade walls, which are dry on both sides. <br />Exposed faces of walls shall have the outer 2 inches of the exposed face filled with <br />a cement grout, which shall match the color and texture of the surrounding wall <br />surface. <br />3.6 JOINT CONSTRUCTION: <br />A. Setting Waterstop: <br />1. In order to eliminate faulty installation that may result in joint leakage, the <br />CONTRACTOR shall be particularly careful to get the correct positioning of the <br />Waterstop during installation. Adequate provisions must be made to support and <br />anchor the Waterstop during the progress of the WORK and to insure the proper <br />embedment in the concrete. The symmetrical halves of the Waterstop shall be <br />equally divided between the concrete pours at the joints. The center axis of the <br />Waterstop shall be coincident with the joint openings. Maximum density and <br />imperviousness of the concrete shall be insured by thoroughly working it in the <br />vicinity of all joints. <br />2. In placing PVC Waterstop in the forms, the CONTRACTOR shall provide means to <br />prevent the Waterstop from being folded over by the concrete as it is placed. <br />Waterstop shall be held in place with light wire ties on 12-inch centers which shall <br />be passed through hog rings at the edge of the Waterstop and tied to the curtain <br />of reinforcing steel. Horizontal Waterstop, with their flat face in a vertical plane, <br />shall be held in place with continuous supports to which the top edge of the <br />Waterstop shall be tacked. In placing concrete around horizontal Waterstop, with <br />their flat face in a horizontal plane, the CONTRACTOR shall work concrete under <br />the Waterstop by hand so as to avoid the formation of air and rock pockets. <br />3. In placing center bulb Waterstop in expansion joints, the center bulb shall be <br />centered on the joint filler material. <br />4. Waterstop in vertical wall joints shall stop 6 inches from the top of the wall where <br />such Waterstop does not connect with any other Waterstop and is not to be <br />connected to a future concrete placement. <br />B. Joint Location: <br />1. Construction joints and other types of joints shall be provided where indicated. <br />When not indicated, construction joints shall be provided at 25-foot maximum <br />spacing for all concrete construction. Where joints are indicated spaced greater <br />than 40 feet apart, additional joints shall be provided to maintain the 25-foot <br />maximum spacing. The location of all joints, of any type, shall be submitted for <br />acceptance by the ENGINEER. <br />C. Joint Preparation: <br />1. The CONTRACTOR shall take special care in preparing concrete surfaces at joints <br />where bonding between 2 sections of concrete is required. Unless otherwise <br />indicated, such bonding will be required at all horizontal joints in walls. Surfaces
The URL can be used to link to this page
Your browser does not support the video tag.