My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 033100 Structure Concrete-3 <br />and Inspection of Water Vapor Retarders Used in Contact with Earth <br />or Granular Fill Under Concrete Slabs. <br />y. ASTM E1745 – Standard Specification for Water Vapor Retarders <br />Used in Contact with Soil or Granular Fill Under Concrete Slabs. <br /> <br />1.3 SUBMITTALS <br /> <br />A. Submit proposed mix design of each class of concrete to Engineer not later than <br />10 days after Notice to Proceed or 15 days prior to the first concrete placement, <br />whichever comes first. <br /> <br />B. Submit shop drawings of reinforcing steel under provisions of Division 01 – <br />General Requirements. <br /> <br />1. Initial submittal of reinforcement shop drawings shall be complete. No <br />partial submittals will be accepted. <br /> <br />2. Indicate reinforcement sizes, spacings, locations and quantities of <br />reinforcing steel, and wire reinforcement, bending and cutting schedules, <br />splicing, supporting and spacing devices. <br /> <br />3. Reinforcement placement shop drawings for foundations and walls shall <br />conform to ACI SP-66 providing full wall elevations. <br /> <br />C. Material Certificates: For each of the following, signed by the manufacturers: <br /> <br />1. Cementitious materials. <br /> <br />2. Admixtures. <br /> <br />3. Waterstop. <br /> <br />4. Curing compounds. <br /> <br />5. Bonding agents. <br /> <br />6. Vapor retarders. <br /> <br />D. Material Test Reports: For the following, from a qualified testing agency, <br />indicating compliance with requirements: <br /> <br />1. Aggregates. <br /> <br />1.4 QUALITY ASSURANCE <br /> <br />A. Perform work in accordance with ACI 301, 305R, and 306.1. <br /> <br />B. Maintain copy of ACI 301 on site. <br /> <br />C. Source Limitations: Obtain each type or class of cementitious material of the same <br />brand from the same manufacturer’s plant, obtain aggregate from one source, and <br />obtain admixtures through one source from a single manufacturer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.