Laserfiche WebLink
<br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 033500 Concrete Finishing-6 <br /> <br />3.5 PROTECTION <br /> <br />A. Keep premises clean and free of debris. <br /> <br />B. Protect adjoining surfaces from damage, dust and spatter related to the work of this <br />section. <br /> <br />1. Repair damage caused by the work of this section. <br />2. Clean dust and spatter from adjoining surfaces. <br /> <br />C. Advise all contractors, vendors and others working in the areas completed that the <br />concrete slab surface is the finished floor and is to be protected accordingly as in <br />Section 1.05 F. <br /> <br />D. Protect floors from damage until Grand Opening. Use of plastic sheeting is not <br />permitted. <br /> <br />E. Follow system manufacturer’s instruction for cleaning to ensure proper protection <br />from dirt and debris. <br /> <br />3.6 INSPECTION <br /> <br />A. Request acceptance by Owner’s Representative and Architect for the finished floor. <br /> <br />B. Correct all unacceptable work to the satisfaction of the Owner’s Representative and <br />the Architect. <br /> <br /> <br />END OF SECTION